Invention Grant
US08347124B2 Workload power consumption projection on information handling system 有权
信息处理系统的工作负载功耗预测

Workload power consumption projection on information handling system
Abstract:
The projected power consumption for an application program running on a future IHS is determined by generating a power proxy for the application program, and power proxies for a plurality of standard benchmarks. An algorithm correlates the power proxy for the application program, and the power proxies for the standard benchmarks to generate weighted surrogates that are combined with power proxies derived from running the benchmark surrogates on the future IHS to generate the projected power consumption.
Information query
Patent Agency Ranking
0/0