Invention Grant
- Patent Title: Optimizing power consumption by dynamic workload adjustment
- Patent Title (中): 通过动态工作负载调整优化功耗
-
Application No.: US12713776Application Date: 2010-02-26
-
Publication No.: US08489745B2Publication Date: 2013-07-16
- Inventor: Nagapramod Mandagere , Seshashayee S. Murthy , Sandeep M. Uttamchandani , Pin Zhou
- Applicant: Nagapramod Mandagere , Seshashayee S. Murthy , Sandeep M. Uttamchandani , Pin Zhou
- Applicant Address: US NY Armonk
- Assignee: International Business Machines Corporation
- Current Assignee: International Business Machines Corporation
- Current Assignee Address: US NY Armonk
- Agency: Schmeiser, Olsen & Watts, LLP
- Agent Matthew Chung
- Main IPC: G06F15/173
- IPC: G06F15/173

Abstract:
A system and associated method for optimizing power consumption of a data center by dynamic workload adjustment. A current workload distribution of the data center is shifted to an optimal workload solution that provides acceptable level of service with the least amount of power consumption. The sum of power cost and migration cost that corresponds to the optimal workload solution is the lowest among all sums that correspond to respective candidate workload solutions. The power cost is determined by a maximum temperature of the data center and accompanying cooling cost for each candidate workload solution. The migration cost is determined by performance degradation that occurs during shifting a workload distribution of the data center from the current workload distribution to each candidate workload solution.
Public/Granted literature
- US20110213508A1 OPTIMIZING POWER CONSUMPTION BY DYNAMIC WORKLOAD ADJUSTMENT Public/Granted day:2011-09-01
Information query