Invention Grant
US08494889B2 Optimized maintenance schedules based on smart city maintenance profiles
有权
基于智能城市维护配置文件优化维护计划
- Patent Title: Optimized maintenance schedules based on smart city maintenance profiles
- Patent Title (中): 基于智能城市维护配置文件优化维护计划
-
Application No.: US13159945Application Date: 2011-06-14
-
Publication No.: US08494889B2Publication Date: 2013-07-23
- Inventor: Conrad James Johnson , Andrew Jason Lavery , James Michael Pavlovsky , Lorin Evan Ullmann
- Applicant: Conrad James Johnson , Andrew Jason Lavery , James Michael Pavlovsky , Lorin Evan Ullmann
- Applicant Address: US NY Armonk
- Assignee: International Business Machines Corporation
- Current Assignee: International Business Machines Corporation
- Current Assignee Address: US NY Armonk
- Agency: VanLeeuwen & VanLeeuwen
- Agent Jeffrey S. LaBaw
- Main IPC: G06F9/46
- IPC: G06F9/46

Abstract:
An approach is provided in which a maintenance optimizer receives a policy change threshold that corresponds to a system. The maintenance optimizer monitors real-time condition data associated with the system, and determines whether the real-time condition data has reached the policy change threshold. If the real-time condition data has not reached the policy change threshold, the maintenance optimizer generates a maintenance operation notification based upon the real-time condition data according to a maintenance schedule policy. However, if the real-time condition data has reached the policy change threshold, the maintenance optimizer generates an alternate maintenance operation notification based upon the real-time condition data according to an alternate maintenance schedule policy.
Public/Granted literature
- US20120323615A1 OPTIMIZED MAINTENANCE SCHEDULES BASED ON SMART CITY MAINTENANCE PROFILES Public/Granted day:2012-12-20
Information query