Invention Grant
- Patent Title: Method of improving the production of a mature gas or oil field
- Patent Title (中): 改善成熟气田或油田生产的方法
-
Application No.: US12816915Application Date: 2010-06-16
-
Publication No.: US08532968B2Publication Date: 2013-09-10
- Inventor: Jean-Marc Oury , Bruno Heintz , Hugues de Saint Germain , Rémi Daudin , Benoit Desjardins
- Applicant: Jean-Marc Oury , Bruno Heintz , Hugues de Saint Germain , Rémi Daudin , Benoit Desjardins
- Applicant Address: FR Paris
- Assignee: Foroil
- Current Assignee: Foroil
- Current Assignee Address: FR Paris
- Agency: Cozen O'Connor
- Main IPC: G06G7/48
- IPC: G06G7/48

Abstract:
A method of improving the production of a mature gas or oil field, the field comprising a plurality of existing wells, the method comprising the steps of providing a field simulator capable of predicting a production of the field in function of a given scenario, a scenario being a set of data comprising production parameters of the existing wells and, the case may be, location and production parameters of one or more new wells, determining drainage areas of the existing wells using the field simulator, determining locations of candidate new wells such that drainage areas of the candidate new wells, determined using the field simulator, do not overlap with the drainage areas of the existing wells, optimizing the value of a gain function which depends on the field production by determining a set of wells out of a plurality of sets of wells, which optimize the value of said gain function, each set of wells of said plurality of sets of wells comprising the existing wells and new wells selected among the candidate new wells.
Public/Granted literature
- US20110313743A1 Method of Improving the Production of a Mature Gas or Oil Field Public/Granted day:2011-12-22
Information query