US08606609B2 Method and system for visually indicating project task durations are estimated using a single character 有权
使用单个字符估计可视化指示项目任务持续时间的方法和系统

Method and system for visually indicating project task durations are estimated using a single character
Abstract:
The present invention relates to designating that durations of specific tasks are estimated or tentative. The user can indicate estimated durations by the sheet mode or the dialog mode. Estimated duration characters are symbols of uncertainty, such as “?”, that indicate that the duration entries are not fixed and final, but may need to be adjusted in the future. The user can select an option to not display the estimated duration character even though the estimated field for the task is set. The user can also select an option to have new tasks that are created have estimated duration characters until the user chooses to enter a duration value. The program can also filter the task list to display only tasks that have estimated duration characters.
Public/Granted literature
Information query
Patent Agency Ranking
0/0