Invention Grant
US08645174B2 System and method for managing stakeholder impact on sustainability for an organization
有权
管理利益相关者对组织可持续发展影响的制度和方法
- Patent Title: System and method for managing stakeholder impact on sustainability for an organization
- Patent Title (中): 管理利益相关者对组织可持续发展影响的制度和方法
-
Application No.: US12766012Application Date: 2010-04-23
-
Publication No.: US08645174B2Publication Date: 2014-02-04
- Inventor: Terrence G. Clark , Peter J. Gilbert
- Applicant: Terrence G. Clark , Peter J. Gilbert
- Applicant Address: US NY Islandia
- Assignee: CA, Inc.
- Current Assignee: CA, Inc.
- Current Assignee Address: US NY Islandia
- Agency: Baker Botts, L.L.P.
- Main IPC: G06Q10/00
- IPC: G06Q10/00

Abstract:
A computer-implemented method for managing stakeholder impact on sustainability for an organization is disclosed. The method may include storing a plurality of instances of a stakeholder object. Each instance may define a plurality of characteristics of a stakeholder of the organization. In certain embodiments, the characteristics may be selected from the group consisting of: a description of the stakeholder, a category of the stakeholder, a description of a relationship with the stakeholder, an owner of the relationship with the stakeholder, a description of a stakeholder investment in the organization, a first indication of an extent to which a stakeholder interest actually aligns with an organizational interest, a second indication of an extent to which the stakeholder interest is optimally aligned with the organizational interest, a description of an approval power granted to the stakeholder, an importance rating of the stakeholder relationship from a perspective of the organization; and an anticipated effect of a sustainability project of the organization on the stakeholder relationship. The method may further include establishing a computer-based logical link between at least one instance of the stakeholder object to at least one sustainability project of the organization. The method may also include generating a progress report of the sustainability project and determining that a particular stakeholder of the organization is logically linked to the sustainability project. In certain embodiments, the method may include, automatically transferring the progress report to the stakeholder of the organization, wherein the progress report is transferred in a desired format.
Public/Granted literature
- US20110060616A1 System and Method for Managing Stakeholder Impact on Sustainability for an Organization Public/Granted day:2011-03-10
Information query