Invention Grant
- Patent Title: Method of estimating the maximum power generation capacity and for controlling a specified power reserve of a single cycle or combined cycle gas turbine power plant, and a power generating system for use with said method
- Patent Title (中): 估计最大发电量和控制单个循环或联合循环燃气轮机发电厂的规定动力储备的方法,以及用于所述方法的发电系统
-
Application No.: US13683359Application Date: 2012-11-21
-
Publication No.: US08700223B2Publication Date: 2014-04-15
- Inventor: Eric Andre Mueller
- Applicant: ALSTOM Technology Ltd
- Applicant Address: CH Baden
- Assignee: ALSTOM Technology Ltd.
- Current Assignee: ALSTOM Technology Ltd.
- Current Assignee Address: CH Baden
- Agency: Buchanan Ingersoll & Rooney PC
- Priority: DE102008002660 20080626; CH1278/08 20080814
- Main IPC: G05D3/12
- IPC: G05D3/12 ; G05D5/00 ; G05D9/00 ; G05D11/00 ; G05D17/00

Abstract:
An estimation unit can estimate, on a real-time basis, a maximum power generation capacity of a single cycle or combined cycle gas turbine power plant. For example, the actual power output and the maximum power generation capacity can be calculated relying on a mathematical process model. Subsequently, the calculated actual power output can be compared with the measured power output yielding a model-estimation error. Based on the model-estimation error, a correction signal can be deduced, to correct the calculated maximum power generation capacity. A controller can maintain a specified power reserve. The controller can use an estimate of the maximum power generation capacity as a reference, subtract a load offset, and apply the resulting signal as upper limit of the load set-point.
Public/Granted literature
Information query