Invention Grant
US08700371B2 System and method for controlling an advancing fluid front of a reservoir 失效
用于控制储存器前进流体前部的系统和方法

System and method for controlling an advancing fluid front of a reservoir
Abstract:
A system and method for controlling an advancing water front in a reservoir toward a wellbore is provided. The system has a production control unit. The production control unit has a reservoir unit for producing a reservoir model and a production path unit for producing a production path model that determines at least one pressure parameter about the wellbore during a life of the wellbore. The production control unit has a production optimizer unit for producing a well plan that optimizes a function of the wellsite. The production control unit may be for controlling an advancing fluid front in the reservoir with at least one control device, and wherein a production path is constructed based on the well plan.
Information query
Patent Agency Ranking
0/0