Invention Grant
US08732514B2 Using pulses to control work ingress 有权
使用脉冲来控制工作进入

Using pulses to control work ingress
Abstract:
Clock pulses of a variable speed clock are adjusted relative to system utilization. A load monitor periodically collects sensor measurements of resources and based on the sensor measurements, the load monitor adjusts the clock speed up or down.
Public/Granted literature
Information query
Patent Agency Ranking
0/0