Invention Grant
US08752061B2 Resource allocation within multiple resource providers based on the incoming resource request and the expected state transition of the resource requesting application, and selecting a resource provider based on the sum of the percentage of the resource provider currently used, the requesting load as a percentage of the resource provider's total resource, and the additional load imposed by the expected state of the requesting application as a percentage of the resource provider's total resource
有权
基于资源请求应用的传入资源请求和预期状态转换,在多个资源提供者内的资源分配,以及基于当前使用的资源提供者的百分比之和,请求负载的百分比来选择资源提供者 资源提供商的总资源以及作为资源提供者总资源的百分比的请求应用程序的预期状态所施加的额外负载
- Patent Title: Resource allocation within multiple resource providers based on the incoming resource request and the expected state transition of the resource requesting application, and selecting a resource provider based on the sum of the percentage of the resource provider currently used, the requesting load as a percentage of the resource provider's total resource, and the additional load imposed by the expected state of the requesting application as a percentage of the resource provider's total resource
- Patent Title (中): 基于资源请求应用的传入资源请求和预期状态转换,在多个资源提供者内的资源分配,以及基于当前使用的资源提供者的百分比之和,请求负载的百分比来选择资源提供者 资源提供商的总资源以及作为资源提供者总资源的百分比的请求应用程序的预期状态所施加的额外负载
-
Application No.: US13128025Application Date: 2008-11-24
-
Publication No.: US08752061B2Publication Date: 2014-06-10
- Inventor: Vladimir Litovtchenko , Florian Bogenberger
- Applicant: Vladimir Litovtchenko , Florian Bogenberger
- Applicant Address: US TX Austin
- Assignee: Freescale Seimconductor, Inc.
- Current Assignee: Freescale Seimconductor, Inc.
- Current Assignee Address: US TX Austin
- International Application: PCT/IB2008/054917 WO 20081124
- International Announcement: WO2010/058246 WO 20100527
- Main IPC: G06F9/46
- IPC: G06F9/46 ; G06F15/173

Abstract:
A device receives a request for an amount of a resource. It determines for each resource provider in a set of resource providers a current load, a requested load corresponding to the requested amount of the resource, and an additional load corresponding to an expected state of an application. It determines for each of the resource providers an expected total load on the basis of the current load, the requested load, and the additional load. It subsequently selects from the set of resource providers a preferred resource provider on the basis of the expected total loads. The resource may be one of the following: memory, processing time, data throughput, power, and usage of a device.
Public/Granted literature
- US20110214129A1 MANAGEMENT OF MULTIPLE RESOURCE PROVIDERS Public/Granted day:2011-09-01
Information query