Invention Grant
US08813087B2 Managing a workload in a cluster of computing systems with multi-type operational resources 有权
在具有多种类型的运营资源的计算系统集群中管理工作负载

Managing a workload in a cluster of computing systems with multi-type operational resources
Abstract:
Determining an equivalent capacity (ECP) of a computing system comprising multi-type operational resources. The multi-type operational resources comprises at least one general type of resources and at least one specialized type of resources Parameters characteristic of the performance of the system is determined. Assignment of work units to the various resources subject to pre-defined constraints is simulated. Utilization of said general type of resources of the computing system when executing the work units is calculated.
Information query
Patent Agency Ranking
0/0