Invention Grant
US08826286B2 Monitoring performance of workload scheduling systems based on plurality of test jobs 有权
监控基于多个测试作业的工作负载调度系统的性能

Monitoring performance of workload scheduling systems based on plurality of test jobs
Abstract:
The present invention relates to the field of enterprise network computing. In particular, it relates to monitoring workload of a workload scheduler. Information defining a plurality of test jobs of low priority is received. The test jobs have respective launch times, and are launched for execution in a data processing system in accordance with said launch times and said low execution priority. The number of test jobs executed within a pre-defined analysis time range is determined A performance decrease warning is issued if the number of executed test jobs is lower than a predetermined threshold number. A workload scheduler discards launching of jobs having a low priority when estimating that a volume of jobs submitted with higher priority is sufficient to keep said scheduling system busy.
Public/Granted literature
Information query
Patent Agency Ranking
0/0