Invention Grant
US08903667B2 State-of-charge estimation method, state-of-charge estimation device, and secondary-battery power system
有权
充电状态估算方法,充电状态估算装置和二次电池电力系统
- Patent Title: State-of-charge estimation method, state-of-charge estimation device, and secondary-battery power system
- Patent Title (中): 充电状态估算方法,充电状态估算装置和二次电池电力系统
-
Application No.: US13616792Application Date: 2012-09-14
-
Publication No.: US08903667B2Publication Date: 2014-12-02
- Inventor: Etsuzo Sato , Noriyasu Iwane
- Applicant: Etsuzo Sato , Noriyasu Iwane
- Applicant Address: JP Tokyo JP Inukami-gun
- Assignee: Furukawa Electric Co., Ltd.,Furukawa Automotive Systems Inc.
- Current Assignee: Furukawa Electric Co., Ltd.,Furukawa Automotive Systems Inc.
- Current Assignee Address: JP Tokyo JP Inukami-gun
- Agency: Oblon, Spivak, McClelland, Maier & Neustadt, L.L.P.
- Priority: JP2010-079617 20100330
- Main IPC: G01R31/36
- IPC: G01R31/36

Abstract:
There is provided a state-of-charge estimation method, a state-of-charge estimation device, and a secondary-battery power system that may quickly and stably determine the convergence value of an adjustment parameter of a voltage characteristic formula that may approximate change over time of an open-circuit voltage of a secondary battery with high precision by appropriately setting the initial value of the adjustment parameter. At step S14, a selected voltage measurement values V1, VMbi ((i=1 to (n−1)), and VMm are used to calculate an initial value A0i (i=1 to n) of an adjustment parameter Ai (i=1 to n). In addition, at step S15, an integer string bi (i=1 to (n−1)) and a real number C are used to calculate an initial value B01 (i=1 to n) of an adjustment parameter Bi (i=1 to n).
Public/Granted literature
- US20130013237A1 STATE-OF-CHARGE ESTIMATION METHOD, STATE-OF-CHARGE ESTIMATION DEVICE, AND SECONDARY-BATTERY POWER SYSTEM Public/Granted day:2013-01-10
Information query