Invention Grant
- Patent Title: Method for joint configuration of nuclear power plant fuel
- Patent Title (中): 联合配置核电厂燃料的方法
-
Application No.: US13322551Application Date: 2010-05-21
-
Publication No.: US08953733B2Publication Date: 2015-02-10
- Inventor: Zirong Ma
- Applicant: Zirong Ma
- Applicant Address: CN Futian District, Shenzhen, Guangdong CN Futian District, Shenzhen, Guangdong CN Futian District, Shenzhen, Guangdong
- Assignee: China Nuclear Power Engineering Compay Ltd.,China Nuclear Power Technology Research Institute,China Guangdong Nuclear Power Holding Corporation
- Current Assignee: China Nuclear Power Engineering Compay Ltd.,China Nuclear Power Technology Research Institute,China Guangdong Nuclear Power Holding Corporation
- Current Assignee Address: CN Futian District, Shenzhen, Guangdong CN Futian District, Shenzhen, Guangdong CN Futian District, Shenzhen, Guangdong
- Agency: Global IP Services
- Agent Tianhua Gu
- Priority: CN200910107548 20090527
- International Application: PCT/CN2010/073041 WO 20100521
- International Announcement: WO2010/135968 WO 20101202
- Main IPC: G21C19/02
- IPC: G21C19/02 ; G21C19/20 ; G21C19/00 ; G21C3/30 ; G21D3/00

Abstract:
A method for joint configuration of nuclear power plant fuel includes the following steps: (S1) for at least one operating unit, based on an equilibrium cycle or transition cycle reactor core design, at least one new fuel element is added to at least one operating unit; (S2) after running a combustion cycle, and on basis of the new fuel elements in step (S1), more first spent fuel elements are obtained from the at least one operating unit than are obtained from the equilibrium cycle or transition cycle reactor core design, and said first spent fuel elements are kept in reserve; (S3) for at least one new starting unit, a scheduled number of new fuel elements, as well as the first spent fuel elements obtained for reserve in step (S2), are set in the first reactor cores of at least one new starting unit.
Public/Granted literature
- US20120069948A1 Method for Joint Configuration of Nuclear Power Plant Fuel Public/Granted day:2012-03-22
Information query