Invention Grant
US09122529B2 Dynamic job processing based on estimated completion time and specified tolerance time
有权
基于估计完成时间和指定的公差时间进行动态作业处理
- Patent Title: Dynamic job processing based on estimated completion time and specified tolerance time
- Patent Title (中): 基于估计完成时间和指定的公差时间进行动态作业处理
-
Application No.: US13961881Application Date: 2013-08-07
-
Publication No.: US09122529B2Publication Date: 2015-09-01
- Inventor: Charles Prael , Adrian Tymes
- Applicant: SEARCHLITE ADVANCES LLC
- Main IPC: G06F9/46
- IPC: G06F9/46 ; G06F9/50

Abstract:
The invention provides a system and method for managing clusters of parallel processors for use by groups and individuals requiring supercomputer level computational power. A Beowulf cluster provides supercomputer level processing power. Unlike a traditional Beowulf cluster; however, cluster size in not singular or static. As jobs are received from users/customers, a Resource Management System (RMS) dynamically configures and reconfigures the available nodes in the system into clusters of the appropriate sizes to process the jobs. Depending on the overall size of the system, many users may have simultaneous access to supercomputer level computational processing. Users are preferably billed based on the time for completion with faster times demanding higher fees.
Public/Granted literature
- US20140040911A1 DYNAMIC JOB PROCESSING BASED ON ESTIMATED COMPLETION TIME AND SPECIFIED TOLERANCE TIME Public/Granted day:2014-02-06
Information query