Invention Grant
- Patent Title: Advanced coal upgrading process for a power station
- Patent Title (中): 一个电站先进的煤炭升级过程
-
Application No.: US13148945Application Date: 2010-11-17
-
Publication No.: US09187697B2Publication Date: 2015-11-17
- Inventor: Rodolfo Antonio M. Gomez
- Applicant: Rodolfo Antonio M. Gomez
- Agency: Klauber & Jackson LLC
- Priority: AU2010900019 20100104; AU2010900974 20100309; AU2010901438 20100406; AU2010901706 20100422
- International Application: PCT/AU2010/001547 WO 20101117
- International Announcement: WO2011/047446 WO 20110428
- Main IPC: C10B53/04
- IPC: C10B53/04 ; C10B53/06 ; C10G1/00 ; C10B19/00 ; C10L9/08 ; F23K1/04

Abstract:
A coal or carbonaceous material upgrading process for power station use, the process comprising a number of steps. First comminuting the coal or carbonaceous to a comminuted material. Second pre-treating the comminuted coal with a pulsing single frequency microwave and vacuum to reduce its water and oxygen content; the pre-treating stage being carried out at a temperature of up to 180 C. Third, treating the pre-treated comminuted material with a pulsing single frequency microwave energy under vacuum to optimize the volatile organic materials; the treatment stage being carried out at a temperature of up to 350 C. Next pyrolyzing the treated coal with a pulsing single frequency microwave and vacuum to produce a hot gas and a solid carbon residue; the pyrolyzing stage is carried out at a temperature of up to 720 C. The solid carbon residue can then be separated from the hot gas, the volatile organic materials condensed to produce a liquid hydrocarbon product and a gas product; and the solid material and the gas product fed to a power station to produce electricity therefrom. The microwave energy applied at each of the stages has a single frequency of 100 megahertz to 300 gigahertz, has circular polarisation, and is pulsed at a frequency of 2 to 50 kilohertz. The pre-treatment step, the treatment step, and the pyrolysis step can be done under vacuum.
Public/Granted literature
- US20110314730A1 ADVANCED COAL UPGRADING PROCESS FOR A POWER STATION Public/Granted day:2011-12-29
Information query