Invention Grant
US09228427B2 Completion method to allow dual reservoir saturation and pressure monitoring 有权
完井方法允许双储层饱和和压力监测

Completion method to allow dual reservoir saturation and pressure monitoring
Abstract:
A well completion method provides for monitoring of reservoir pressure and saturation levels for two reservoirs from a single monitoring well. The well completion extends vertically through an upper and a lower reservoir. The well is cased, cemented, and perforated across the lower reservoir. A cement free zone is formed by cementing the casing string within the wellbore above an external casing packer above the upper reservoir. The casing string is perforated to allow fluid from the upper reservoir to flow through the cement free zone. A tubing string is landed and set within the casing string. The tubing string is sealed above and below the perforation at the cement free zone to prevent communication between fluid from the upper reservoir and the lower reservoir. The upper reservoir is monitored at the cement free zone, and the lower reservoir is monitored below an end of the tubing string.
Information query
Patent Agency Ranking
0/0