Invention Grant
- Patent Title: Completion method to allow dual reservoir saturation and pressure monitoring
- Patent Title (中): 完井方法允许双储层饱和和压力监测
-
Application No.: US13329514Application Date: 2011-12-19
-
Publication No.: US09228427B2Publication Date: 2016-01-05
- Inventor: Fahad Al-Ajmi
- Applicant: Fahad Al-Ajmi
- Applicant Address: SA Dhahran
- Assignee: Saudi Arabian Oil Company
- Current Assignee: Saudi Arabian Oil Company
- Current Assignee Address: SA Dhahran
- Agency: Bracewell & Giuliani LLP
- Agent Constance Gall Rhebergen; Keith R. Derrington
- Main IPC: E21B47/00
- IPC: E21B47/00 ; E21B43/14 ; E21B43/12

Abstract:
A well completion method provides for monitoring of reservoir pressure and saturation levels for two reservoirs from a single monitoring well. The well completion extends vertically through an upper and a lower reservoir. The well is cased, cemented, and perforated across the lower reservoir. A cement free zone is formed by cementing the casing string within the wellbore above an external casing packer above the upper reservoir. The casing string is perforated to allow fluid from the upper reservoir to flow through the cement free zone. A tubing string is landed and set within the casing string. The tubing string is sealed above and below the perforation at the cement free zone to prevent communication between fluid from the upper reservoir and the lower reservoir. The upper reservoir is monitored at the cement free zone, and the lower reservoir is monitored below an end of the tubing string.
Public/Granted literature
- US20130105150A1 COMPLETION METHOD TO ALLOW DUAL RESERVOIR SATURATION AND PRESSURE MONITORING Public/Granted day:2013-05-02
Information query