Invention Grant
- Patent Title: Full butt joint structure of connection joint between side frame and cross beam of bogie frame and assembly welding process
- Patent Title (中): 侧框架和转向架横梁之间的连接接头的全对接结构和组装焊接过程
-
Application No.: US13852905Application Date: 2013-03-28
-
Publication No.: US09260119B2Publication Date: 2016-02-16
- Inventor: Li Chang
- Applicant: Changchun Railway Vehicles Co., Ltd.
- Applicant Address: CN Jilin
- Assignee: CHANGCHUN RAILWAY VEHICLES CO., LTD.
- Current Assignee: CHANGCHUN RAILWAY VEHICLES CO., LTD.
- Current Assignee Address: CN Jilin
- Agency: J.C. Patents
- Priority: CN201010293968 20100928
- Main IPC: B61F5/00
- IPC: B61F5/00 ; B61F5/52 ; B23K31/00 ; B23K9/00

Abstract:
A full butt joint structure of a connection joint between a side frame and a cross beam of a bogie frame, characterized in: the side frame is connected to the cross beam by a connecting seat to realize the full butt joint, a side frame connecting end of the connecting seat, a transport column and a side frame inside vertical plate form a plate-plate butt joint structure, and a cross beam connecting end of the connecting seat and the cross beam form a tube-tube butt joint structure. An assembly welding process comprises: the connecting seat is assembled and welded to the cross beam; a cross beam unit is assembled and welded; the connecting seat is assembled and welded to the transport column and the side frame inside vertical plate; a side frame strengthen partition plate is assembled and welded to an upper plate; and the bogie frame is welded.
Public/Granted literature
Information query