Invention Grant
US09309752B2 Completing long, deviated wells 有权
完成长期偏斜的井

Completing long, deviated wells
Abstract:
A buoyancy fluid is sealed in an interior central bore of a completion liner with a plug assembly in the interior central bore. The buoyancy fluid has a lower density than the fluid contained in the wellbore. The buoyancy fluid reduces the force, and thus friction, at the interface between the liner and the bottom of the wellbore while the completion liner is being run to final depth. When the buoyancy fluid is no longer needed, the plug assembly can be withdrawn uphole from the completion liner and to the surface.
Public/Granted literature
Information query
Patent Agency Ranking
0/0