Invention Grant
- Patent Title: Steam turbine installation and method for operating the steam turbine installation
- Patent Title (中): 蒸汽轮机安装及运行蒸汽轮机安装方法
-
Application No.: US14131499Application Date: 2012-06-14
-
Publication No.: US09322298B2Publication Date: 2016-04-26
- Inventor: Carsten Graeber , Thomas Loeper , Michael Wechsung
- Applicant: Carsten Graeber , Thomas Loeper , Michael Wechsung
- Applicant Address: DE Munich
- Assignee: SIEMENS AKTIENGESELLSCHAFT
- Current Assignee: SIEMENS AKTIENGESELLSCHAFT
- Current Assignee Address: DE Munich
- Agency: Beusse Wolter Sanks & Maire
- Priority: EP11174006 20110714
- International Application: PCT/EP2012/061251 WO 20120614
- International Announcement: WO2013/007462 WO 20130117
- Main IPC: F01K7/34
- IPC: F01K7/34 ; F01K7/38 ; F01K7/40 ; F22D1/32 ; F01K7/44 ; F01K13/02

Abstract:
A steam turbine installation that has a steam turbine, a steam generator and a feed water pre-heating unit operated by process steam is provided. The steam turbine has an overload bypass line with which main steam can be fed to the feed water pre-heating unit between the steam turbine input and the extraction point during overload operation of the steam turbine, wherein the feed water pre-heating unit has an auxiliary extraction line that is connected to the overload bypass line in such a way that process steam can be extracted from the steam turbine during partial load operation of the steam turbine and added to the feed water pre-heating unit for the additional pre-heating of feed water.
Public/Granted literature
- US20140130499A1 STEAM TURBINE INSTALLATION AND METHOD FOR OPERATING THE STEAM TURBINE INSTALLATION Public/Granted day:2014-05-15
Information query
IPC分类: