Invention Grant
US09458530B2 Method of supplying Zn—Al alloy to molten zinc pot, method of adjusting concentration of Al in molten zinc bath, and apparatus for supplying Zn—Al alloy to molten zinc pot
有权
向熔融锌锅供给Zn-Al合金的方法,调整熔融锌浴中的Al浓度的方法以及向熔融锌锅供给Zn-Al合金的装置
- Patent Title: Method of supplying Zn—Al alloy to molten zinc pot, method of adjusting concentration of Al in molten zinc bath, and apparatus for supplying Zn—Al alloy to molten zinc pot
- Patent Title (中): 向熔融锌锅供给Zn-Al合金的方法,调整熔融锌浴中的Al浓度的方法以及向熔融锌锅供给Zn-Al合金的装置
-
Application No.: US14124306Application Date: 2013-03-04
-
Publication No.: US09458530B2Publication Date: 2016-10-04
- Inventor: Yu Yamauchi , Mikio Kawamura , Masaaki Omodaka , Hideki Nishimura
- Applicant: Nippon Steel & Sumitomo Metal Corporation
- Applicant Address: JP Tokyo
- Assignee: NIPPON STEEL & SUMITOMO METAL CORPORATION
- Current Assignee: NIPPON STEEL & SUMITOMO METAL CORPORATION
- Current Assignee Address: JP Tokyo
- Agency: Birch, Stewart, Kolasch & Birch, LLP
- Priority: JP2012-047546 20120305
- International Application: PCT/JP2013/055821 WO 20130304
- International Announcement: WO2013/133205 WO 20130912
- Main IPC: C23C2/00
- IPC: C23C2/00 ; C23C2/06 ; C23C2/40

Abstract:
A method of supplying a Zn—Al alloy to a molten zinc pot which accommodates a molten zinc bath in a hot dip galvanizing line, includes: supplying the Zn—Al alloy from a supply portion provided at a lower portion of an insertion guide having a pipe shape, in which the supply portion is immersed between an inner wall of the molten zinc pot on a downstream side in a travelling direction of a steel sheet and a front support roll installed in the molten zinc bath at a depth within ±400 mm from a lower end of the front support roll, and an inside of the insertion guide is pressurized by inert gas to prevent the molten zinc bath from advancing to the inside of the insertion guide.
Public/Granted literature
Information query
IPC分类: