Invention Grant
US09458806B2 Methods for correcting spill valve timing error of a high pressure pump 有权
纠正高压泵溢流阀定时误差的方法

Methods for correcting spill valve timing error of a high pressure pump
Abstract:
Methods are provided for correct spill valve timing of a high pressure pump coupled to the direct injection system of an internal combustion engine. A method is needed to monitor and adjust spill valve timing on-board the vehicle, where spill valve timing error may result from sensors error and/or time between command signal and actuation response of the spill valve. To self-correct spill valve timing error on-board a vehicle, methods are proposed that involve monitoring and recording fuel rail pressures, high pressure pump duty cycles, and fractional liquid volume pumped values in order to find zero flow relationships.
Information query
Patent Agency Ranking
0/0