Invention Grant
- Patent Title: Method of operating a wind park
- Patent Title (中): 操作风电场的方法
-
Application No.: US14530768Application Date: 2014-11-02
-
Publication No.: US09541063B2Publication Date: 2017-01-10
- Inventor: Bo Yin
- Applicant: Siemens Aktiengesellschaft
- Applicant Address: DE Munich
- Assignee: Siemens Aktiengesellschaft
- Current Assignee: Siemens Aktiengesellschaft
- Current Assignee Address: DE Munich
- Agency: Beusse Wolter Sanks & Maire
- Priority: EP13192327 20131111
- Main IPC: F03D7/02
- IPC: F03D7/02 ; F03D9/00 ; H02M5/42 ; H02P9/04 ; F03D7/04 ; H02J3/38 ; G05B13/02 ; H02J3/50 ; H02P101/15

Abstract:
A wind turbine is provided having a first converter connected between an electric generator of the wind turbine and a DC link and a second converter connected between the DC link and an output of the wind turbine connectable to a utility grid. The wind turbine further includes a wind turbine controller adapted to control at least one of an output current of the wind turbine, an output voltage of the wind turbine, a reactive output power of the wind turbine, an output voltage of the DC link and an output current of the DC link. The wind turbine further includes a communication device adapted to receive a control signal and to set a control parameter of the wind turbine controller in accordance with the control signal. A network converter, method of operating a wind turbine, methods of operating a wind park and computer-readable storage medium are also provided.
Public/Granted literature
- US20150130187A1 METHOD OF OPERATING A WIND PARK Public/Granted day:2015-05-14
Information query