Invention Grant
US09563217B2 Method and apparatus to optimize generator start delay and runtime following outage 有权
优化发电机启动延迟和运行中断后的方法和装置

Method and apparatus to optimize generator start delay and runtime following outage
Abstract:
A system for providing backup power to a facility includes a generator, and a controller configured to determine whether electrical power to the facility has been interrupted, and automatically determine a generator initial start and restart time delay based at least on a prediction of when an electrical system within the facility needs to be cycled.
Information query
Patent Agency Ranking
0/0