Resource-based job scheduling
Abstract:
Resource-based optimization is used to resolve some abnormal job terminations. An abnormal job termination is analyzed to determine if a resource shortage caused the termination. For a resource-dependent termination, the job is rescheduled for a time when sufficient resources are available.
Public/Granted literature
Information query
Patent Agency Ranking
0/0