Method and apparatus for controlling movement of an elevator group
Abstract:
Call information can be used for scheduling runs of elevators in a group of elevators. The scheduling is done so that based on the call allocations a schedule of expected movements, accelerations and decelerations can be computed. Then the movements, accelerations and decelerations may be controlled in order to improve energy efficiency or for controlling the movement in such manner that the energy consumption peaks or duration of these peaks is reduced.
Public/Granted literature
Information query
Patent Agency Ranking
0/0