Control system for construction machine
Abstract:
A control system for a construction machine includes: a boom cylinder; a boom switching valve; a fluid pressure motor adapted to drive a motor generator by being rotated by means of a return fluid guided from a piston side chamber; a regeneration control valve adapted to adjust a first supply amount serving as a supply amount of a working fluid supplied from the piston side chamber to the boom switching valve, and a second supply amount serving as a supply amount of the working fluid supplied from the piston side chamber to the fluid pressure motor; and a controller adapted to control the regeneration control valve so that the second supply amount becomes smaller than the first supply amount in a case where a stroke amount of a spool becomes an upper limit value or more.
Public/Granted literature
Information query
Patent Agency Ranking
0/0