Deterministic control loop scheduling
Abstract:
In one embodiment, a scheduling device in a network receives routing metrics regarding a network path between a device controller and a networked device. The scheduling device also receives controller metrics for the device controller. The scheduling device determines time costs associated with the network path and one or more control operations performed by the device controller, based on the routing and controller metrics. The scheduling device generates a communication schedule based on the time costs and instructs the device controller and the networked device to use the communication schedule.
Public/Granted literature
Information query
Patent Agency Ranking
0/0