Systems and methods for installing pile structures in permafrost
Abstract:
A pile system for permafrost comprising a pilot hole, at least one pile, and frozen slurry. The pilot hole is formed to a pilot hole depth. The at least one pile is arranged at least partly within the pilot hole and extends to a pile string depth. The frozen slurry is within the pilot hole and is at least partly around the at least one pile.
Public/Granted literature
Information query
Patent Agency Ranking
0/0