-
公开(公告)号:KR101313868B1
公开(公告)日:2013-10-01
申请号:KR1020120134648
申请日:2012-11-26
Applicant: 강릉원주대학교산학협력단
Abstract: PURPOSE: A debris barrier including a plurality of hollow type structures is provided to include simple maintenance and excellent workability and reduce fluidity by absorbing moisture in an avalanche of earth and rocks with a penetration hole. CONSTITUTION: A plurality of hollow type structures (100) of a debris barrier is installed at predetermined intervals. The hollow type structure includes a main body (110) in which a hollow is formed and a penetration hole formed in the main body. The main body is fixed to the ground by a fixing unit in order to block an avalanche of earth and rocks and reduce energy. The penetration hole is formed on the upper surface of the main body and four side surfaces, and a net member is installed. The fixing unit includes a connection member (121), a fixing member (122), a main body connecting member (123), and a fixing and connecting member (124).
Abstract translation: 目的:提供包括多个中空型结构的碎片屏障,其包括简单的维护和优异的可加工性,并通过吸收具有穿透孔的地球和岩石雪崩中的水分来降低流动性。 构成:以预定间隔安装多个中空型结构(100)的碎片阻挡层。 中空型结构包括形成有中空部的主体(110)和形成在主体中的贯通孔。 主体通过固定单元固定在地面上,以阻挡地球和岩石的雪崩并减少能量。 贯通孔形成在主体的上表面和四个侧面上,并且安装有网构件。 固定单元包括连接构件(121),固定构件(122),主体连接构件(123)和固定和连接构件(124)。