Abstract:
An airfoil member (100) comprising has a substrate (120) along at least a portion of an airfoil (102) of the airfoil member. A sheath (122) has a channel (144) receiving a portion (160) of the substrate. A scrim (200) is between the substrate and the sheath. A spacer (220) is between the sheath and the substrate and has a plurality of spaced-apart portions (232, 234) with gaps between the spaced-apart portions.
Abstract:
An airfoil member (100) comprising has a substrate (120) along at least a portion of an airfoil (102) of the airfoil member. A sheath (122) has a channel (144) receiving a portion (160) of the substrate. A plurality of separate spacers (320; 380; 400) are between the sheath and the substrate and have a plurality of gaps between the spacers.
Abstract:
A method of inspecting components between a pre-coated state and a post-coated state is provided. The method entails providing at least first and second datum points onto the component in the pre-coated state, where each of the at least first and second datum points have a substantially hemi-spherical shape and a center point. The center points of each of the at least first and second datum points are utilized for measurement of a selected portion on the component in the pre-coated state. Then, the component is coated. Next, the center points of each of the at least first and second datum points are utilized for measurement of the selected portion on the component in the post-coated state. The pre-coated state measurements and the post-coated state measurements are then correlated for inspection purposes.
Abstract:
An airfoil member (100) comprising has a substrate (120) along at least a portion of an airfoil (102) of the airfoil member. A sheath (122) has a channel (144) receiving a portion (160) of the substrate. A scrim (200) is between the substrate and the sheath. A spacer (220) is between the sheath and the substrate and has a plurality of spaced-apart portions (232, 234) with gaps between the spaced-apart portions.