Variable priority cockpit warning and display system

    公开(公告)号:AU675597B2

    公开(公告)日:1997-02-06

    申请号:AU7956994

    申请日:1994-09-20

    Abstract: An aircraft warning and display system monitors the status of various aircraft equipement (20, 22), and provides cockpit audible and visual messages and indications (52, 53, 59, 67) indicative o f the operational status of the equipment. The operational status of the aircraft is monitored (37, 40), and in response to changes in the operational status of the aircraft for a given equipment status, the priority level of cockpit audible and visual messages and indications are modified to attract the attention of a pilot when pilot action is required. Additionally, information may be displayed (52) to the pilot that indicates specific actions needed to downgrade the priority level of the cockpit messages/indications.

    2.
    发明专利
    未知

    公开(公告)号:ES2105773T3

    公开(公告)日:1997-10-16

    申请号:ES94930453

    申请日:1994-09-20

    Abstract: An aircraft warning and display system monitors the status of various aircraft equipement (20, 22), and provides cockpit audible and visual messages and indications (52, 53, 59, 67) indicative o f the operational status of the equipment. The operational status of the aircraft is monitored (37, 40), and in response to changes in the operational status of the aircraft for a given equipment status, the priority level of cockpit audible and visual messages and indications are modified to attract the attention of a pilot when pilot action is required. Additionally, information may be displayed (52) to the pilot that indicates specific actions needed to downgrade the priority level of the cockpit messages/indications.

    Control of electric loads during generator failure in a multi-generator system

    公开(公告)号:AU682875B2

    公开(公告)日:1997-10-23

    申请号:AU6903694

    申请日:1994-04-21

    Abstract: In response to the loss of a generator in an electrical power system, all operating electrical loads are automatically switched to a second generator, and the electric power system continues to provide power to all of the loads. The total power required to operate all operating loads is permitted to exceed the nominal rated capacity of the operating generator, and the winding temperature or other critical hotspot temperature of the operating generator is monitored to determine whether thermal stress limits will be exceeded. If the critical hotspot temperature approaches the thermal stress limit, certain electrical loads are disconnected via a pre-programmed load shed priority schedule, and thereafter loads are re-connected as other loads are de-energized or if the critical hotspot temperature decreases.

    Variable priority cockpit warning and display system

    公开(公告)号:AU7956994A

    公开(公告)日:1995-04-18

    申请号:AU7956994

    申请日:1994-09-20

    Abstract: An aircraft warning and display system monitors the status of various aircraft equipement (20, 22), and provides cockpit audible and visual messages and indications (52, 53, 59, 67) indicative o f the operational status of the equipment. The operational status of the aircraft is monitored (37, 40), and in response to changes in the operational status of the aircraft for a given equipment status, the priority level of cockpit audible and visual messages and indications are modified to attract the attention of a pilot when pilot action is required. Additionally, information may be displayed (52) to the pilot that indicates specific actions needed to downgrade the priority level of the cockpit messages/indications.

    VARIABLE PRIORITY COCKPIT WARNING AND DISPLAY SYSTEM

    公开(公告)号:CA2172488A1

    公开(公告)日:1995-04-06

    申请号:CA2172488

    申请日:1994-09-20

    Abstract: An aircraft warning and display system monitors the status of various aircraft equipement (20, 22), and provides cockpit audible and visual messages ant indications (52, 53, 59, 67) indicative of the operational status of the equipement. The operational status of the aircraft is monitored (37, 40), and in response to changes in the operational status of the aircraft for a given equipement status, the priority level of cockpit audible and visual messages and indications are modified to attract the attention of a pilot when pilot action is required. Additionally, information may be displayed (52) to the pilot that indicates specific actions needed to downgrade the priority level of the cockpit messages/indications.

    Control of electric loads during generator failure in a multi-generator system

    公开(公告)号:AU6903694A

    公开(公告)日:1994-12-20

    申请号:AU6903694

    申请日:1994-04-21

    Abstract: In response to the loss of a generator in an electrical power system, all operating electrical loads are automatically switched to a second generator, and the electric power system continues to provide power to all of the loads. The total power required to operate all operating loads is permitted to exceed the nominal rated capacity of the operating generator, and the winding temperature or other critical hotspot temperature of the operating generator is monitored to determine whether thermal stress limits will be exceeded. If the critical hotspot temperature approaches the thermal stress limit, certain electrical loads are disconnected via a pre-programmed load shed priority schedule, and thereafter loads are re-connected as other loads are de-energized or if the critical hotspot temperature decreases.

    CONTROL OF ELECTRIC LOADS DURING GENERATOR FAILURE IN A MULTI-GENERATOR SYSTEM

    公开(公告)号:CA2161528A1

    公开(公告)日:1994-12-08

    申请号:CA2161528

    申请日:1994-04-21

    Abstract: In response to the loss of a generator in an electrical power system, all operating electrical loads are automatically switched to a second generator, and the electric power system continues to provide power to all of the loads. The total power required to operate all operating loads is permitted to exceed the nominal rated capacity of the operating generator, and the winding temperature or other critical hotspot temperature of the operating generator is monitored to determine whether thermal stress limits will be exceeded. If the critical hotspot temperature the thermal stress limit, certain electrical loads are disconnected via a pre-programmed load shed priority schedule, and thereafter loads are re-connected as other loads are de-energized or if the critical hotspot temperature decreases.

Patent Agency Ranking