公开(公告)号:US20240287967A1
公开(公告)日:2024-08-29
申请号:US18572843
申请日:2022-06-24
Applicant: Vestas Wind Systems A/S
Inventor: Rene' Kvist Sørensen , Rasmus Sanderhoff Johansen , Christine Broe , Jacob Christophersen , Rasmus Bøgelund Madsen
IPC: F03D13/20
CPC classification number: F03D13/205 , F05B2230/60 , F05B2240/912
Abstract: A method of assembling a wind turbine tower section (12a) from a plurality of tower segments (22) includes providing the plurality of tower segments (22) to a wind turbine installation site (32), forming a tower section frame assembly (96) by connecting at least two tower segments (22a, 22b) with a support beam (72), wherein the tower section frame assembly (96) forms a framework on which to further assemble the tower section (12a), arranging the tower section frame assembly (96) on an assembly stand (42), and attaching the remaining plurality of tower segments (22c-22h) to the tower section frame assembly (96) to form the tower section (12a). A method of preinstalling splice plates (106) on the tower segments (22a-22h) for guiding or assembly simplification purposes is also disclosed. The splice plates (106) may be preinstalled from the factory or at the installation site (32).
-
公开(公告)号:US20220228565A1
公开(公告)日:2022-07-21
申请号:US17611939
申请日:2020-05-19
Applicant: Vestas Wind Systems A/S
Inventor: Jakob Anders Sørensen , Christine Broe , Rasmus Sanderhoff Johansen
Abstract: A method for erecting a wind turbine tower is disclosed. A tower section (8) comprising a lower flange (9) and an upper flange (10), and a plurality of stud bolts (6) and nuts (7) are provided. The tower section (8) is oriented in an upright position with the lower flange (9) below the upper flange (10), and stud bolts (6) are positioned in bolt holes (12) in the lower flange (9) with nuts (7) arranged on an upper side of the lower flange (9). The tower section (8) is lifted to a mounting position on top of another tower section (13), and a flange combination is formed by aligning the bolt holes (12) formed in the lower flange (9) of the tower section (8) with bolt holes (15) formed in an upper flange (14) of the other tower section (13), while advancing the stud bolts (6) through the bolt holes (12, 15). The invention further provides a socket tool (16) for screwing nuts (7) onto stud bolts (6) in a manner which positions the stud bolts (6) correctly with respect to a flange (9).
-
公开(公告)号:US12000377B2
公开(公告)日:2024-06-04
申请号:US17611939
申请日:2020-05-19
Applicant: Vestas Wind Systems A/S
Inventor: Jakob Anders Sørensen , Christine Broe , Rasmus Sanderhoff Johansen
CPC classification number: F03D13/20 , B23P19/067 , E04H12/085 , E04H12/342 , F05B2230/604 , F05B2260/301
Abstract: A method for erecting a wind turbine tower is disclosed. A tower section (8) comprising a lower flange (9) and an upper flange (10), and a plurality of stud bolts (6) and nuts (7) are provided. The tower section (8) is oriented in an upright position with the lower flange (9) below the upper flange (10), and stud bolts (6) are positioned in bolt holes (12) in the lower flange (9) with nuts (7) arranged on an upper side of the lower flange (9). The tower section (8) is lifted to a mounting position on top of another tower section (13), and a flange combination is formed by aligning the bolt holes (12) formed in the lower flange (9) of the tower section (8) with bolt holes (15) formed in an upper flange (14) of the other tower section (13), while advancing the stud bolts (6) through the bolt holes (12, 15). The invention further provides a socket tool (16) for screwing nuts (7) onto stud bolts (6) in a manner which positions the stud bolts (6) correctly with respect to a flange (9).
-
-