-
-
-
-
公开(公告)号:KR101244992B1
公开(公告)日:2013-03-18
申请号:KR1020120022542
申请日:2012-03-05
CPC classification number: E02D5/80 , E02D3/12 , E02D5/62 , E02D5/74 , E02D2200/12 , E02D2200/14 , E02D2250/003 , E02D2600/30
Abstract: PURPOSE: A ground anchor and an anchor construction method thereof are provided to increase the holding power and to effectively have an easy installation and construction of a ground anchor. CONSTITUTION: A ground anchor includes a head unit, a support unit and a protection tube(500). The head unit comprises a head case(200), an expansion part(300) and a pusher part(400). The support unit is composed with a length applied to a normal ground anchor and fixed inside the head case. The protection tube is assembled to the inner circumference of the pusher part by a tight fit and composed with an end having a length enough to cover the support unit.
Abstract translation: 目的:提供一种地锚及其锚固施工方法,以提高保持力,并有效地使地锚的安装和施工变得容易。 构成:地锚包括头单元,支撑单元和保护管(500)。 头单元包括头壳(200),膨胀部(300)和推动部(400)。 支撑单元由施加到正常地面锚固件的长度构成,并固定在头部壳体内。 保护管通过紧密配合组装到推动器部分的内周,并且具有足够长度以覆盖支撑单元的端部。
-
公开(公告)号:KR100983453B1
公开(公告)日:2010-09-20
申请号:KR1020090094079
申请日:2009-10-01
Applicant: 윤정배
Abstract: PURPOSE: A method for greening a slope by burying slow-acting fertilizer soil containing jellyfish fertilizer and soil at the upper portion. CONSTITUTION: A method or greening a slope for continuous nutrition supply comprises: a step of evenly arranging the earth surface of the slope to be constructed; a step of hammering an anchor pin(30) to a clutch fixation ring; a step of mounting a plurality of clutches; a step of spreading out a net(40) prepared to cover entire slope; a step of separately mounting the net in a certain interval by the clutch; a step of mounting a fixture(20) to a pin fixing device(22) and the anchor pin to net between the wires to prevent; a step of mounting a basement soil(200) on the slope; and a step of mounting planting soil(100) in a proper thickness. The basement soil contains 29-39 weight parts of sludge, 3-9 weight parts of paper making fiber, 10-30 weight parts of jellyfish fertilizer, 40-60 weight parts of leaf mold, and 20-40 weight parts of soil.
Abstract translation: 目的:通过在上部埋藏含有水母肥料和土壤的缓慢施肥肥料土来绿化斜坡的方法。 构成:持续营养供给的一种方法或绿化坡度包括:均匀布置要建造的坡体地表的步骤; 将锚销(30)锤击到离合器固定环的步骤; 安装多个离合器的步骤; 扩展准备覆盖整个斜坡的网络(40)的步骤; 通过离合器以一定间隔分开地安装网的步骤; 将固定装置(20)安装到销固定装置(22)的步骤,并且将销钉固定到网之间以防止线之间的间隔; 将基底土(200)安装在斜坡上的步骤; 以及将适当厚度的种植土(100)安装的步骤。 地下室土壤含有29-39重量份污泥,3-9重量份造纸纤维,10-30重量份水母肥料,40-60重量份叶霉,20-40重量份土壤。
-
-
-
-
-