-
公开(公告)号:PL2449214T3
公开(公告)日:2021-08-23
申请号:PL10793425
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , MEDD MORRIS JAMES , GOUGH RYAN GEORGE , DE LA VERGNE JOHN NICHOLAS , FEARN ANDY ROBERT , DELABBIO FREDRIC CHRISTOPHER
IPC: E21D1/03
-
公开(公告)号:CA2765758C
公开(公告)日:2013-04-02
申请号:CA2765758
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , MEDD MORRIS JAMES , GOUGH RYAN GEORGE , DE LA VERGNE JOHN NICHOLAS , FEARN ANDY ROBERT , DELABBIO FREDRIC CHRISTOPHER
IPC: E21D1/03
Abstract: In forming a mine shaft for an underground mine, earth excavated by a boring machine (21) is transported upwardly by handling unit (22) to a transfer station (33) where it is transferred into skips 36 which are raised and lowered along skip guides 38 within the shaft hole (19) for transport of the excavated material to an earth surface region. Transfer station (33) is moved downwardly as excavation progresses.
-
公开(公告)号:PE13762012A1
公开(公告)日:2012-10-15
申请号:PE0021852011
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , MEDD MORRIS JAMES , GOUGH RYAN GEORGE , DE LA VERGNE JOHN NICHOLAS , FEARN ANDY ROBERT , DELABBIO FREDRIC CHRISTOPHER
IPC: E21D1/03
CPC classification number: E21D1/03
Abstract: PARA FORMAR UN PIQUE DE LA MINA PARA UNA MINA SUBTERRANEA, LA TIERRA EXCAVADA POR UNA MAQUINA DE PERFORACION ES TRANSPORTADA HACIA ARRIBA MEDIANTE EL MANEJO DE LA UNIDAD HACIA UNA ESTACION DE TRANSFERENCIA, DONDE ES TRANSFERIDA DENTRO DE CAJONES, LOS CUALES SON IZADOS Y DESCENDIDOS A LO LARGO DE LAS GUIAS DE LOS CAJONES, DENTRO DEL AGUJERO DEL PIQUE, PARA EL TRANSPORTE DEL MATERIAL EXCAVADO HACIA UNA REGION EN LA SUPERFICIE DE LA TIERRA. LA ESTACION DE TRANSFERENCIA ES MOVIDA HACIA ABAJO CUANDO AVANZA LA EXCAVACION
-
公开(公告)号:CL2011003356A1
公开(公告)日:2012-06-22
申请号:CL2011003356
申请日:2011-12-29
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , MEDD MORRIS JAMES , GOUGH RYAN GEORGE , DE LA VERGNE JOHN NICHOLAS , FEARN ANDY ROBERT , DELABBIO FREDRIC CHRISTOPHER
IPC: E21D1/03
Abstract: MÉTODO PARA LA REMOCIÓN DEL MATERIAL EXCAVADO DESDE UN PIQUE DE LA MINA 19, DURANTE LA FORMACIÓN DEL PIQUE DE LA MINA 19 PARA UNA MINA SUBTERRÁNEA QUE PROPORCIONA UN SISTEMA DE REMOCIÓN MÁS ROBUSTO Y MÁS EFECTIVO, EL CUAL PERMITE EL ABASTECIMIENTO CONTINUO DEL MATERIAL EXCAVADO, CON EL FIN DE CONTINUAR INCLUSO SI LOS DISPOSITIVOS DE LLENADO NO SE ENCUENTRAN EN LA ESTACIÓN, QUE COMPRENDE EL TRANSPORTE DEL MATERIAL EXCAVADO DESDE UNA REGIÓN DE EXCAVACIÓN, ENCIMA DE LA REGIÓN DE EXCAVACIÓN, SOBRE UNA BASE CONTINUADA DURANTE LA EXCAVACIÓN DEL MATERIAL; LA DEPOSITACIÓN DEL MATERIAL EXCAVADO TRANSPORTADO, DENTRO DE UNA PLURALIDAD DE TOLVAS DE ALMACENAMIENTO, PARA FORMAR CARGAS DE TOLVA, DISCRETAS Y ESTÁTICAS, DEL MATERIAL; LA DESCARGA DE FORMA CÍCLICA DE LAS CARGAS DISCRETAS DE LA TOLVA CON EL MATERIAL EXCAVADO, DESDE UNA PLURALIDAD DE TOLVAS DE ALMACENAMIENTO, DENTRO DE UNA SIMILAR PLURALIDAD DE CAJONES; EL IZAMIENTO DE FORMA CÍCLICA DE CADA CAJÓN, Y DESCENDIENDO DE RETORNO EL CAJÓN HACIA LA ESTACIÓN DE TRANSFERENCIA, PARA RECIBIR OTRA DISCRETA CARGA DEL MATERIAL DE LA TOLVA, DESDE LA RESPECTIVA TOLVA ASOCIADA; Y EL RESPOSICIONAMIENTO DE FORMA PERIÓDICA DE LA ESTACIÓN DE TRANSFERENCIA Y DE LAS TOLVAS DE ALMACENAMIENTO, EN UBICACIONES DESPLAZADAS HACIA DEBAJO DE FORMA SUCESIVA EN EL PIQUE CUANDO PROCEDE LA EXCAVACIÓN. ADEMÁS, SE TIENE EL MÉTODO DE FORMACIÓN DE UN PIQUE DE LA MINA, EL APARATO PARA LA REMOCIÓN DEL MATERIAL EXCAVADO DESDE UN PIQUE DE LA MINA, EL APARATO PARA FORMAR UN PIQUE DE LA MINA
-
-
-