Abstract:
Method of operating a wind power plant including the steps of: operating the wind power plant at an currentparameter schedule (P current (v)) performing a wind prediction of wind data (V w ) for a time frame (ΔT) extending to a future time T, determining a desired fatigue load level (F desιred ) of a wind power plant component at the future time T, and during operation of said wind power plant generating an updated parameter schedule (P desιred (v)) to provide the desired fatigue load level (F desired ) at time T if exposed to the predicted wind conditions (V w (t)) during said time frame (ΔT)
Abstract:
The preset invention relates to wind turbines and, in particular inclining a wind turbine from the vertical position. A tower (102) of a wind turbine may be inclined from the vertical position in order to reduce the loads on the tower (102).
Abstract:
The present invention relates to a method for controlling a wind turbine, the wind turbine comprises a rotor connected to a generator, and a rotational speed controller configured to control a speed of the rotor in response to a generator speed reference, and a power controller to control an electric power production, the method comprises the step for receiving a boost command to request a power boost event, so to increase the electrical power production, and imposing a dead band with a dead zone value limit to the rotational speed controller, and wherein the dead band imposes a zero signal to be send to the rotational speed controller, when a speed error is within the dead zone value limit and wherein the dead band imposes an error signal to be send to the rotational speed controller, when a speed error is greater than the dead zone value limit, the error signal being a function of the speed error and the dead zone value limit. The invention also relates to a wind power plant comprising a power plant controller and at least one wind turbine with a control system according to the above mentioned method.
Abstract:
The invention relates to a control system for a wind turbine. The wind turbine comprises a power generator configured to generate power dependent on a power reference and a pitch system configured to adjust the pitch of a blade of the wind turbine dependent on a pitch request. The control system comprises a controller configured to determine the pitch request dependent on an adjustable gain. A gain scheduler comprised by the control system is configured to set the adjustable gain to an increased gain value if a rate of change of the power reference, e.g. an external power reference, exceeds a threshold.
Abstract:
Methods, controllers and computer program products for controlling a wind turbine. Under de-rated operating conditions in which the power requested from a wind turbine is less than the available power, a controller adjusts blade pitch of the wind turbine to reduce the rotor power coefficient. The captured wind power is thereby reduced to be approximately equal to the requested electrical power, which is less than either the available power or the rated power of the wind turbine generator. This reduction in captured power provides the controller with an additional degree of freedom that allows the controller to increase the electrical power output of the wind turbine in response to wind fluctuations without damaging the wind turbine. By allowing increases in power under de-rated conditions, the controller may reduce the amount of pitching necessary to prevent the turbine from exceeding its rated power output level.
Abstract:
A method and associated control arrangement are disclosed for controlling a power output of a wind power plant (WPP) according to a predetermined power ramp rate limit, the WPP comprising a plurality of wind turbine generators (WTGs). The method comprises receiving a first signal indicating that a first WTG is in a ready state to begin producing power. The method further comprises, upon determining that, responsive to the received first signal, beginning power production of the first WTG at a predetermined default power ramp rate would cause the power output of the WPP to exceed the power ramp rate limit, controlling power production of the first WTG using at least one of: a first delay, a power ramp rate reference less than the default power ramp rate, and a power reference less than a nominal power output of the first WTG.
Abstract:
Method of operating a wind power plant including the steps of: operating the wind power plant at an currentparameter schedule (P current (v)) performing a wind prediction of wind data (V w ) for a time frame (ΔT) extending to a future time T, determining a desired fatigue load level (F desιred ) of a wind power plant component at the future time T, and during operation of said wind power plant generating an updated parameter schedule (P desιred (v)) to provide the desired fatigue load level (F desired ) at time T if exposed to the predicted wind conditions (V w (t)) during said time frame (ΔT)