-
公开(公告)号:KR1020040091350A
公开(公告)日:2004-10-28
申请号:KR1020030025163
申请日:2003-04-21
Applicant: 박재만
Inventor: 박재만
IPC: E01D2/00
Abstract: PURPOSE: A PSS(PreStressed Steel) girder is provided to obtain the required upward moment with less stressing force, to reduce the cost and time for a stressing work, and to minimize a partial breakdown of the end of the girder. CONSTITUTION: A tendon(10) is arranged along the longitudinal direction of a beam structure formed by joining horizontally at least two combined bodies that are formed by connecting vertically at least two beams(5). Both ends of the tendon are fixed and installed at the beam positioned higher than other beams of the beam structure combined vertically. An intermediate part of the tendon is hung and mounted to the lower beam of the beam structure combined vertically. The beam structure is cambered by stressing force of the tendon. A supporting plate(20) are inserted with both ends of the tendon with forming holes and fixed and combined at the beam, which is positioned high. A main saddle(25) is hung with the tendon at the lower side and fixed and joined at the lower beam.
Abstract translation: 目的:提供PSS(预应力钢)梁以获得所需的向上力矩,较少的应力,以减少应力作业的成本和时间,并最大限度地减少梁端部的部分破裂。 构成:沿着梁结构的纵向布置腱(10),所述梁结构通过水平连接至少两个通过垂直连接至少两个梁(5)形成的组合体而形成。 腱的两端固定并安装在垂直方向组合的梁结构的其他梁的高度处。 腱的中间部分悬挂并安装到垂直组合的梁结构的下梁上。 梁结构由腱的应力引起。 支撑板(20)插入其中具有成形孔的钢筋的两端,并且固定并组合在位于高度的梁上。 主鞍(25)在下侧悬挂有腱,并固定在下梁上。
-
公开(公告)号:KR100427405B1
公开(公告)日:2004-04-17
申请号:KR1020010011754
申请日:2001-03-07
Applicant: 박재만
Inventor: 박재만
IPC: E01D2/00
Abstract: A PSSC complex girder in which a section shape steel structure is formed by joining one or more section shape steel. The PSSC complex girder includes a tension means for tensioning the section shape steel structure with a tensional member so that the structure has a predetermined camber. Concrete is poured in an inner space portion of the section shape steel structure. A strengthening plate for supporting buckling and compression is joined to the section shape steel. A sheer prevention member and steel reinforcement are joined to the section shape steel and the concrete is poured therein. The camber of the PSSC complex girder can be adjusted before or after construction for new bridges and conventional bridges. Deflection of the slab can be easily decreased and cracks caused by flexural deformation can be prevented.
Abstract translation: 一种PSSC复合梁,其中通过连接一个或多个截面形状的钢来形成截面形状的钢结构。 PSSC复合梁包括张紧装置,该张紧装置用张紧构件张紧截面形状钢结构,使得该结构具有预定的外倾角。 在混凝土浇筑在型钢结构的内部空间部分。 用于支撑屈曲和压缩的加强板与截面形状的钢结合。 预防构件和钢筋连接在型钢上并浇注混凝土。 PSSC复合梁的外倾角可在新桥梁和传统桥梁施工之前或之后进行调整。 可以容易地减小板坯的挠曲,并且可以防止由弯曲变形引起的裂缝。
-
公开(公告)号:KR1020030085620A
公开(公告)日:2003-11-07
申请号:KR1020020023488
申请日:2002-04-29
Applicant: 박재만
IPC: E01D21/00
Abstract: PURPOSE: A jacking method for an upper structure of a bridge is provided to prevent the fall, distortion and crack of a bridge when jacking the upper structure of a bridge. CONSTITUTION: The jacking method for an upper structure of a bridge comprises the steps of: interposing many hydraulic jacks(110¯130) on the lower part of a support beam(20) of a floor slab(10) and connecting hydraulic jacks(110¯130) and an oil pump(170) by a pipeline; installing a saddle bracket(200) coupled with a control rod(270) to the lower end of a support beam(20) of the floor slab(10) supported by the hydraulic jacks(110¯130); fixing a control rod guide bracket(300) to one side of a pier(30) to make the control rod(270) parallel to the side of the pier(30); fitting a control rod fixture(400) to the control rod(270) exposed to the lower end of the control rod guide bracket(300) and fixing the back end with a pin; and driving the oil pump(170) to make the compressed oil flow in through a pipeline, then lift up a support beam(20) of the floor slab(10).
Abstract translation: 目的:提供一种桥梁上部结构的起重方法,以防止在桥梁上部结构抬起时桥梁的坠落,变形和破裂。 构成:桥梁上部结构的上升方法包括以下步骤:在楼板(10)的支撑梁(20)的下部插入许多液压千斤顶(110〜130),并连接液压千斤顶(110) 130)和油泵(170)通过管道; 将与控制杆(270)联接的鞍座(200)安装到由液压千斤顶(110〜130)支撑的地板(10)的支撑梁(20)的下端; 将控制杆引导支架(300)固定到墩(30)的一侧,以使控制杆(270)平行于码头(30)的一侧; 将控制杆固定装置(400)装配到暴露于控制杆引导支架(300)的下端的控制杆(270)上,并用销固定后端; 并且驱动油泵(170)使压缩油通过管道流入,然后提升楼板(10)的支撑梁(20)。
-
-
公开(公告)号:KR100373522B1
公开(公告)日:2003-03-03
申请号:KR1020000046153
申请日:2000-08-09
Applicant: 박재만
Inventor: 박재만
IPC: E01D22/00
Abstract: PURPOSE: A steel wire reinforcing method of a steel plate girder bridge using a composite anchorage-reinforcement part is provided to prevent buckle without damaging a steel plate girder, to reinforce by re-tensioning and to prevent damage caused by corrosion. CONSTITUTION: A steel wire reinforcing method of a steel plate girder bridge using a composite anchorage-reinforcement part comprises the steps of installing an iron frame(110) on both ends of a steel girder plate(10) of a steel plate girder bridge, forming a special concrete layer(120) to the inside of the iron frame(110), fixing an anchor bracket(130) to the outside of the iron frame(110) and the special concrete layer(120) by a high tensile bolt(150), fixing a gusset plate to both sides of the steel girder plate(10), forming a special concrete layer(120) to the lower part of the gusset plate, fixing primary and secondary saddles to the special concrete layer(120) by using the high tensile bolt(150), hanging a steel wire(W) on the primary and secondary saddles and connecting both ends of the steel wire(W) to an anchorage(400) coupled to an anchorage bearing part(140) of the anchor bracket(130), then tensioning and fixing.
Abstract translation: 目的:提供一种采用复合锚固加固部件的钢板梁桥的钢丝加固方法,以防止扣损而不损坏钢板梁,通过再张紧来加固并防止腐蚀造成的损坏。 一种钢板梁桥的钢丝加固方法,其特征在于,在钢板梁桥的钢梁板(10)的两端安装铁框(110),成形 (110)内部的特殊混凝土层(120),通过高强度螺栓(150)将锚固托架(130)固定到铁框架(110)和特殊混凝土层(120)的外侧 ),将角撑板固定到钢梁板(10)的两侧,在角撑板的下部形成专用混凝土层(120),通过使用第一和第二鞍座将特殊混凝土层(120)固定到特殊混凝土层 所述高拉力螺栓150在所述主鞍座和所述辅鞍座上悬挂钢丝W并将所述钢丝W的两端连接到与所述锚固件的锚固支承部件140连接的锚固件400上, 支架(130),然后张紧和固定。
-
公开(公告)号:KR100348632B1
公开(公告)日:2002-08-22
申请号:KR1019990066227
申请日:1999-12-30
Applicant: 박재만
Inventor: 박재만
IPC: E01D22/00
Abstract: 본발명은교량의 PC빔의단부하측에결합되어상방향으로받쳐주는ㄷ자형빔하부받침형가설브래키트와, 상기빔하부받침형가설브래키트의측면에구비된걸림부의하부에결합되어상기빔하부받침형가설브래키트를상방향으로받쳐주는지지빔과, 상기지지빔과교각의상면사이에설치되어 PC빔을인상하는인상수단으로이루어진빔하부받침형역방향가설브래키트를이용한교량빔의인상장치와, 이를이용한역방향가설브래키트를이용한교량빔의인상방법을제공하고있다. 이러한본 발명은기존교량구조물에손상을주지않고교량의인상이가능하여구조물의안정성과장수명화에기여하는이점이있고, 이동및 설치가용이하도록 3개부분으로분리제작되어현장에서조립설치되는빔하부받침형가설브래키트를이용하여시공성이용이할뿐 아니라, 작업을안전하게행할수 있는이점이있으며, 각종교량에이미제작된빔하부받침형가설브래키트를조립하여인상잭킹공법을신속하게적용할수 있는이점이있고, 작업성을고려한빔 종단부의설치위치를적용하여작업시지장을주지않아작업성이향상되는이점이있다.
-
公开(公告)号:KR200227911Y1
公开(公告)日:2001-06-15
申请号:KR2020000036386
申请日:2000-12-26
Applicant: 박재만
Inventor: 박재만
IPC: E01D22/00
Abstract: 본 고안은 상부 구조물 인상을 위한 조립식 브래키트에 관한 것으로, 교량의 교각 및 교대의 코핑부와 같은 제1 대상물과 교각 위에 설치되는 PC빔 등의 주빔과 같은 제2 대상물의 사이에 유압잭과 같은 유압장치를 설치하여 제2 대상물을 인상하는 장치에 있어서, 상기 제1 대상물과 제2 대상물의 양측부에 결합되고 그들 사이의 중간부에 가로질러 고정되는 중간요소를 피하여 결합될 수 있도록 간섭방지홈이 구비되며, 상기 유압장치를 설치하기 위한 버팀부가 상기 제2 대상물의 외측으로 돌출되게 형성되는 한 쌍의 분할요소와, 상기 양쪽 분할요소를 결합되는 길이를 가변시켜 체결하기 위한 가변체결요소를 포함하여 구성된다. 이러한 본 고안은 교각과 교대의 코핑부 상단을 덮는 형태로 구조물 손상과 교통통제 없이 받침부에 조립, 설치하여 잭을 설치한 후 신속하고 안전하게 교량 상부 구조물을 인상할 수 있는 이점이 있다. 또, 버팀판을 추가 설정하여 단부판과의 충분한 용접길이를 확보할 수 있으므로 내하력이 증가되어 더 큰 잭킹력에 견딜 수 있는 이점이 있다. 또한, 형하공간 및 연단거리의 제약을 해소할 수 있는 이점이 있고, 연결판의 볼트 채움에 의하여 조립식 브래키트를 폭이 다른 교각에 재사용할 수 있는 이점이 있다. 그리고, 이동 및 실처가 용이하도록 2개 부분으로 제작되어 있으므로 시공성이 용이한 이점이 있다.
-
公开(公告)号:KR200208848Y1
公开(公告)日:2001-01-15
申请号:KR2020000022680
申请日:2000-08-09
Applicant: 박재만
Inventor: 박재만
IPC: E01D22/00
Abstract: 본 고안은 합성 정착보강부를 이용한 강판형교의 강선 보강장치에 관한 것으로, 강판형교(steel plate girder bridge)의 강판보(steel plate girder)의 양단부에 철재골조를 형성하고, 특수콘크리트층을 타설하여 양생시키며, 그 외측으로 정착구 지지부가 구비된 정착 브래키트를 결합하고, 강판보의 중간부에는 복수개의 새들을 결합한 후, 상기 정착 브래키트의 정착구 지지부에 결합되는 정착구와 새들에 강연선을 걸치고 긴장시켜 내하력을 증강시키는 장치이다. 이러한 본 고안은 종래에는 프리스트레스 공법을 적용할 때에 강판보의 단부를 훼손시키지 않고는 주형을 보강할 수 없다는 문제점을 개선하기 위하여 개발된 것으로 단지간과 합성구간 두가지 모두에 사용 가능하며, 강판보를 손상시키지 않고 좌굴을 방지하면서 재긴장시켜 보강할 수 있는 이점이 있고, 부식에 의한 손상을 방지할 수 있는 이점 등이 있다.
-
公开(公告)号:KR200186827Y1
公开(公告)日:2000-06-15
申请号:KR2019990027471
申请日:1999-12-08
Applicant: 박재만
Inventor: 박재만
IPC: B66F1/00
Abstract: 본 고안은 콘크리트 구조물 보수용 인상장치에 관한 것으로, 유압잭의 실린더에 상승되어진 플런저가 하강하지 못하도록 로크시키기 위한 로킹수단과, 상기 플런저에 의해 인상된 인상 대상물의 인상된 높이를 측정하기 위한 측정수단을 포함하여 구성되고, 상기 플런저의 상부에 2단 접촉구를 높이조절수단에 의해 높이 조절 가능하게 결합하여 구성된다.
이러한 본 고안은 유압잭의 플런저 상부에 2단 접촉구를 높이조절수단에 의해 높이 조절 가능하게 구성되어 있으므로 인상 대상물과 지지요소사이의 거리가 상이한 경우에 다양하게 설치하여 편리하게 보수, 보강공사를 행할 수 있는 이점이 있다. 또, 플런저 조립체를 인상시킨 후, 로킹수단의 잠금구로 플런저가 하강하지 못하도록 로킹함으로써 인상된 인상 대상물을 안정하게 유지할 수 있는 이점이 있으며, 이에 따라 인상 후 행하는 보수, 보강공사를 안전하고 간편하게 행할 수 있는 이점이 있다. 또한, 인상잭의 상단부에 합성교좌장치를 설치하여 교량 보수, 보강공사를 위한 인상작업시 교좌장치의 공백으로 인한 교량의 파손을 방지하는 이점이 있다.Abstract translation: 目的:提供一种用于修复混凝土结构的升降装置,以通过使用高度调节器来控制升高的高度,并通过使用锁定部件将柱塞锁定在升高的状态。 构成:为了提升物体(O),例如PC梁,油液装置安装在物体的两端和支撑元件(S)之间。 旋转高度调节器(15)的插座(16),以将两步接触器(14)的粘合板(14A)附接到物体的下表面上。 油压提升装置连接到油压泵,用于通过软管(6A)将抽油机液压油喷射到每个油压提升装置中的气缸(1)的油压端口(1A)上。 气缸的油压室中的压力增大,用于升高包括柱塞主体(3)和两级接触器的柱塞组件(P)。 因此,物体被升高,并且锁定部件(10)的储物柜(9)旋转以将上端附接到一步接触器(5)的粘合板(5A)上。 因此,防止接触器降低,并且防止柱塞组件降低以保持物体的升高状态。
-
公开(公告)号:KR200182611Y1
公开(公告)日:2000-05-15
申请号:KR2019990027470
申请日:1999-12-08
Applicant: 박재만
Inventor: 박재만
IPC: E04C5/08
Abstract: 본 고안은 PC빔의 양단부에 고정되는 정착구의 후방에 결합되고 PC강연선을 고정하기 위한 적어도 하나 이상의 콜렛이 결합되어진 헤드에 연결되는 연결결합요소와, 상기 연결결합요소를 후방으로 당겨주기 위한 긴장수단과, 상기 긴장수단에 의해 상기 연결결합요소가 당겨져 상기 PC강연선이 인장된 후 상기 정착구의 고정판과 헤드 사이에 삽입하여 상기 PC강연선 및 헤드의 복귀를 저지함으로써 인장된 형태를 유지하기 위한 간격유지구를 포함하여 구성된다.
이러한 본 고안은 정착구의 헤드 외측으로 PC강연선이 짧게 노출된 경우에도 연결결합요소로 연장시켜 인장잭으로 긴장시킬 수 있으므로, 교량빔의 처짐을 PC강연선의 돌출된 길이에 구애됨이 없이 폭넓게 보강할 수 있는 이점이 있다. 따라서, 본 고안은 종래 기술에 비하여 교량빔의 처짐을 보정하는 데 따른 소요공기를 단축하고 공비를 현저히 절감할 수 있으며 보다 효율적인 보정이 가능하게 될 뿐만 아니라, 특히 재긴장작업을 폭넓게 적용하여 적기의 보정이 가능하게 됨으로써 교량빔을 포함하는 상부 구조물 즉, 전체 교량의 안정성을 적기에 확보할 수 있는 효과가 있다.
-
-
-
-
-
-
-
-
-