21.
公开(公告)号:US12147222B2
公开(公告)日:2024-11-19
申请号:US17500982
申请日:2021-10-14
Applicant: ABB Schweiz AG
Inventor: Reinhard Bauer , Martin Hollender , Marco Gaertler
IPC: G05B19/418
Abstract: To determine a quality indicator of production batch-run of a production process, a computer compares time-series with multi-source data from a reference batch-run and time-series with multi-source data from the production batch-run. Before comparing, the computer converts multi-variate time-series to uni-variate time-series, by first multiplying data values of source-specific uni-variate time-series with source-specific factors from a conversion factor vector and second summing up the multiplied data values according to discrete time points. The source-specific factors of the conversion factor vector are obtained earlier by processing reference data, including the determination of characteristic portions of the time-series, converting, aligning by time-warping and evaluating displacement in time between characteristic portions before alignment and after alignment.
-
公开(公告)号:US12001985B2
公开(公告)日:2024-06-04
申请号:US17507819
申请日:2021-10-22
Applicant: ABB Schweiz AG
Inventor: Martin Hollender , Felix Lenders , Josef Bicik , Mark Stefan Struempfler , Rebekka Litzelmann , Dominik Steickert
IPC: G06Q10/00 , G06Q10/0631
CPC classification number: G06Q10/06316
Abstract: A system for action determination includes an input unit, a processing unit, and an output unit. The input unit provides the processing unit with information relating to a plurality of past actions over a period of time associated with the operation of an industrial process. The input unit provides the processing unit with information relating to a plurality of past process events over the time period associated with the operation of the industrial process. The input unit provides the processing unit with information relating to a new process event. The processing unit determines a correlation between at least some of the plurality of past actions with at least some of the past process events. The processing unit determines at least one recommended action from the information relating to the new process event, the determination including utilization of the determined correlation. The output unit outputs the at least one recommended action.
-
23.
公开(公告)号:US11567483B2
公开(公告)日:2023-01-31
申请号:US16850010
申请日:2020-04-16
Applicant: ABB Schweiz AG
Inventor: Benedikt Schmidt , Martin Hollender , Felix Lenders
IPC: G05B19/418
Abstract: A computer-implemented method to control technical equipment that performs a production batch-run of a production process, the technical equipment providing data in a form of time-series from a set of data sources, the data sources being related to the technical equipment, includes: accessing a reference time-series with data from a previously performed batch-run of the production process, the reference time-series being related to a parameter for the technical equipment; and while the technical equipment performs the production batch-run: receiving a production time-series with data, identifying a sub-series of the reference time-series, and comparing the received time-series and the sub-series of the reference time-series, to provide an indication of similarity or non-similarity, in case of similarity, controlling the technical equipment during a continuation of the production batch-run, by using the parameter as control parameter.
-
公开(公告)号:US20230029400A1
公开(公告)日:2023-01-26
申请号:US17957609
申请日:2022-09-30
Applicant: ABB Schweiz AG
Inventor: Benedikt Schmidt , Ido Amihai , Arzam Muzaffar Kotriwala , Moncef Chioua , Dennis Janka , Felix Lenders , Jan Christoph Schlake , Martin Hollender , Hadil Abukwaik , Benjamin Kloepper
IPC: G06N20/00
Abstract: A method of hierarchical machine learning includes receiving a topology model having information on hierarchical relations between components of the industrial plant, determining a representation hierarchy comprising a plurality of levels, wherein each representation on a higher level represents a group of representations on a lower level, wherein the representations comprise a machine learning model, and training an output machine learning model using the determined hierarchical representations.
-
公开(公告)号:US20230019404A1
公开(公告)日:2023-01-19
申请号:US17956117
申请日:2022-09-29
Applicant: ABB Schweiz AG
Inventor: Benjamin Kloepper , Benedikt Schmidt , Ido Amihai , Moncef Chioua , Jan Christoph Schlake , Arzam Muzaffar Kotriwala , Martin Hollender , Dennis Janka , Felix Lenders , Hadil Abukwaik
IPC: G06N20/20
Abstract: A computer-implemented method for automating the development of industrial machine learning applications includes one or more sub-methods that, depending on the industrial machine learning problem, may be executed iteratively. These sub-methods include at least one of a method to automate the data cleaning in training and later application of machine learning models, a method to label time series (in particular signal data) with help of other timestamp records, feature engineering with the help of process mining, and automated hyper-parameter tuning for data segmentation and classification.
-
26.
公开(公告)号:US20220035351A1
公开(公告)日:2022-02-03
申请号:US17500982
申请日:2021-10-14
Applicant: ABB Schweiz AG
Inventor: Reinhard Bauer , Martin Hollender , Marco Gaertler
IPC: G05B19/418
Abstract: To determine a quality indicator of production batch-run of a production process, a computer compares time-series with multi-source data from a reference batch-run and time-series with multi-source data from the production batch-run. Before comparing, the computer converts multi-variate time-series to uni-variate time-series, by first multiplying data values of source-specific uni-variate time-series with source-specific factors from a conversion factor vector and second summing up the multiplied data values according to discrete time points. The source-specific factors of the conversion factor vector are obtained earlier by processing reference data, including the determination of characteristic portions of the time-series, converting, aligning by time-warping and evaluating displacement in time between characteristic portions before alignment and after alignment.
-
公开(公告)号:US20210149385A1
公开(公告)日:2021-05-20
申请号:US17159177
申请日:2021-01-27
Applicant: ABB Schweiz AG
Inventor: Andrew Cohen , Martin Hollender , Nuo Li , Moncef Chioua , Matthieu Lucke
IPC: G05B23/02 , G06F16/245 , G08B29/02
Abstract: An apparatus for alarm information determination includes: an input unit; a processing unit; and an output unit. The input unit provides the processing unit with historical process control data, the process control data including a plurality of data signals, a plurality of alarm data, and data relating to an event of interest. The processing unit determines a plurality of correlation scores for the plurality of data signals paired with the plurality of alarm data, a correlation score being determined for a data signal paired with an alarm data, a high correlation score indicating a higher degree of correlation than a low correlation score. The processing unit identifies at least one first alarm data from the plurality of alarm data, the identification including utilization of the data relating to the event of interest.
-
公开(公告)号:US10831748B2
公开(公告)日:2020-11-10
申请号:US15256655
申请日:2016-09-05
Applicant: ABB Schweiz AG
Inventor: Mario Hoernicke , Martin Hollender , Steve Royston
IPC: G06F16/20 , G06F16/245 , G05B23/02
Abstract: A method for sorting alarm-messages of a plant having at least one alarm-area each having at least two plant-devices connected by at least one connection, wherein the at least one alarm-area is defined so that the plant-devices and the respective connection provide a directed graph, involves: providing at least one database containing alarm-data and topology-data; wherein the topology-data describe a directed graph having at least one connection with a related flow direction between the respective plant-devices of the respective assigned alarm-area; generating at least one partly complete first alarm-order of the alarm-messages of the at least one alarm-area by sorting the alarm-messages according to the flow direction of the directed graph.
-
公开(公告)号:US10824963B2
公开(公告)日:2020-11-03
申请号:US16178629
申请日:2018-11-02
Applicant: ABB Schweiz AG
Inventor: Martin Hollender , Benjamin Kloepper , Moncef Chioua
IPC: G08B21/00 , G06N20/00 , G05B23/02 , G05B19/418
Abstract: An alarm handling system in plant process automation with a data processing device includes: at least one interface for accessing and/or processing one or more process signals and for determining corresponding process variables; an alarm configuration device for accessing and/or providing alarm configuration information including at least one setpoint for one or more determined process variables; and a prediction device for determining and processing a current rate of change of at least one process variable to predict how long it will take and/or a period until and/or predict at which date and/or time a provided setpoint and/or threshold is reached and/or crossed, and/or for determining whether and/or when at least one of the monitored and/or determined process variable values will cross the respective setpoint.
-
-
-
-
-
-
-
-