Method for Generating an Enriched Alarm Message

    公开(公告)号:US20240330725A1

    公开(公告)日:2024-10-03

    申请号:US18618057

    申请日:2024-03-27

    Applicant: ABB Schweiz AG

    CPC classification number: G06N5/04

    Abstract: A method for generating an enriched alarm message associated to an initial alarm message of a concerned component of a plant includes providing a plurality of information model rules related to alarm messages for respective interrelations of components of the plant; applying the plurality of information model rules related to the alarm messages to respective components of a topology of the plant, for generating a system of information model rules related to the respective alarm messages of the plant; inferring logical consequences for the system of information model rules, which are related to the initial alarm message originated by the concerned component; and generating the enriched alarm message by combining the information model rules related to the initial alarm message of the concerned component, based on the inferred logical consequences.

    System and methods with reduced complexity in the integration of exposed information models with applications

    公开(公告)号:US11422777B2

    公开(公告)日:2022-08-23

    申请号:US17105656

    申请日:2020-11-27

    Applicant: ABB Schweiz AG

    Abstract: A computer system for automated model integration of an information model with a corresponding application includes: an information model server for exposing an information model to a consumer, the exposed information model including model-elements for exposing types or classes, and for exposing instances of types or classes and their member-values; an application component for providing application code augmented with mapping descriptions defining how an internal information model of the application is mapped to the exposed information model; and a model integration component that: registers internal information model-elements to be exposed; maps the registered internal information model-elements to exposed information model-elements in accordance with the mapping descriptions; and updates an information model-element by: detecting a change of an internal or exposed information model-element; determining a synchronization direction; and performing match-making to determine a model-element corresponding to the changed model-element by using signatures of the corresponding information model-elements.

    Computer-Implemented Method for Configuring a Sub-System of a Plant

    公开(公告)号:US20240361741A1

    公开(公告)日:2024-10-31

    申请号:US18642920

    申请日:2024-04-23

    Applicant: ABB Schweiz AG

    CPC classification number: G05B19/05 G05B2219/15006

    Abstract: A system and method includes storing a description of at least one sensor in a database; storing a description of the at least one actuator in the database; storing a PLC-list comprising a description of the at least one PLC in the database; writing a controller program that describes an action of the at least one actuator caused by the at least one sensor; selecting, based on the database and the controller program, a PLC of the PLC-list, which is able to functionally connect the sensor and the actuator; generating an application for controlling the selected PLC based on the selected PLC and the controller program; and transferring the application to the selected PLC thus configuring and/or functionally connecting the at least one sensor and the at least one actuator of the sub-system.

    Production line for manufacturing a part of a vehicle

    公开(公告)号:US11971702B2

    公开(公告)日:2024-04-30

    申请号:US17069878

    申请日:2020-10-14

    Applicant: ABB Schweiz AG

    Abstract: A production line for manufacturing a building block, which includes at least one component, the production line including: a central conveyor line; at least one feeding line for feeding the at least one component to the central conveyor line; a manufacturing tool set for processing the at least one component; and a control unit for controlling the central conveyor line, the feeding line, and/or the manufacturing tool set. The controlling at least one of the central conveyor line, the feeding line, and/or the manufacturing tool set includes: retrieving an asset-information about the at least one component and/or the manufacturing tool set, conveying the at least one component according to the asset-information by the feeding line to the central conveyor line, retrieving a processing-information and/or a manufacturing tool set information about processing the at least one component, and processing the at least one component by the manufacturing tool set.

    Industrial information identification and retrieval system

    公开(公告)号:US11860964B2

    公开(公告)日:2024-01-02

    申请号:US16923110

    申请日:2020-07-08

    Applicant: ABB Schweiz AG

    CPC classification number: G06F16/9538 G06F16/951

    Abstract: An industrial information identification and retrieval system includes: a crawler; a search engine; a result processor; and a web user interface “web UL” The crawler identifies devices and their associated Open Platform Communication Unified Architecture “OPC UA” servers within a network as identified OPC UA servers. The crawler browses the identified OPC UA servers and extracts and stores data items in a database as extracted data items. The search engine searches the extracted data items and provides search results to the result processor. The result processor determines a score for each search result. The web UI presents the search results according to the scores.

    Controlling an Industrial Process Using Virtualized Instances of Control Software

    公开(公告)号:US20220308559A1

    公开(公告)日:2022-09-29

    申请号:US17700981

    申请日:2022-03-22

    Applicant: ABB Schweiz AG

    Abstract: A method for controlling an industrial process includes providing process data of the industrial process to an active instance of a control software as input, based on this input, updating an internal state of the active instance of the control software that is characterized by a set of internal variables of this active instance; based on this updated internal state, determining an output signal and outputting this output signal to at least one piece of equipment that is configured to alter a state, and/or a behavior, of the industrial process. The method further includes providing a prioritized subset of the internal variables that characterize the state of the active instance to at least one further instance of a control software that is configured to take over control of the industrial process in case of a failure and/or malfunction of the active instance.

Patent Agency Ranking