-
公开(公告)号:PE20130828A1
公开(公告)日:2013-08-17
申请号:PE2012001349
申请日:2011-02-22
Applicant: TECH RESOURCES PTY LTD
Inventor: ODDIE MAX EDWARD , JONES COLIN IAN , LABRECQUE PIERRE , DELABBIO FREDRIC CHRISTOPHER
IPC: E21C41/22
Abstract: METODO DE MINERIA POR HUNDIMIENTO DE BLOQUES QUE COMPRENDE EXCAVAR TUNELES 21 DE SOCAVADO A UN NIVEL DE SOCAVADO; PERFORAR ORIFICIOS 25 DE VOLADURA DE SOCAVADO A TRAVEZ DE LOS TECHOS DE TUNEL DE SOCAVADO Y COLOCAR Y DETONAR CARGAS EXPLOSIVAS EN ESOS ORIFICIOS PARA VOLAR ROCAS ENCIMA DE LOS TUNELES DE SOCAVADO PARA INICIAR LA FORMACION DE CAVERNAS 26 DE ROCAS ENCIMA DE LOS TUNELES 21 DE SOCAVADO; EXCAVAR TUNELES 22 A NIVEL DE EXTRACCION A UN NIVEL DE EXTRACCION INFERIOR AL NIVEL DE SOCAVADO; PERFORAR ORIFICIOS 33 DE VOLADURA DE PUNTO DE EXTRACCION HACIA ARRIBA DESDE LOS TUNELES A NIVEL DE EXTRACCION EN UBICACIONES DE PUNTO DE EXTRACCION SELECCIONADAS HACIA LAS CAVERNAS 26 DE ROCAS ROTAS Y COLOCAR Y DETONAR CARGAS EXPLOSIVAS EN ESOS ORIFICIOS PARA VOLAR PUNTOS 32 DE EXTRACCION A TRAVES DE LOS CUALES CAE ROCA ROTA DENTRO DE LOS TUNELES 22 A NIVEL DE EXTRACCION; EN EL QUE ALGO DE LA EXCAVACION SE REALIZA MECANICAMENTE MEDIANTE MAQUINARIA TUNELADORA
-
公开(公告)号:MX2012009756A
公开(公告)日:2012-10-05
申请号:MX2012009756
申请日:2011-02-22
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , ODDIE MAX EDWARD , JONES COLIN IAN , LABRECQUE PIERRE
Abstract: La presente describe un método de minería por hundimiento de bloques que comprende excavar túneles 21 de socavado a un nivel de socavado; perforar orificios 25 de voladura de socavado a través de los techos de túnel de socavado y colocar y detonar cargas explosivas en esos orificios para volar rocas encima de los túneles de socavado para iniciar la formación de cavernas 26 de rocas rotas encima de los túneles 21 de socavado; excavar túneles 22 a nivel de extracción a un nivel de extracción inferior al nivel de socavado; perforar orificios 33 de voladura de punto de extracción hacia arriba desde los túneles a nivel de extracción en ubicaciones de punto de extracción seleccionadas hacia las cavernas 26 de rocas rotas y colocar y detonar cargas explosivas en esos orificios para volar puntos 32 de extracción a través de los cuales cae roca rota dentro de los túneles 22 a nivel de extracción; y retirar progresivamente tal roca caída de las ubicaciones de punto de extracción a través de los túneles 22 a nivel de extracción; en donde algo de la excavación se realiza mecánicamente mediante maquinaria tuneladora.
-
公开(公告)号:PE20121253A1
公开(公告)日:2012-09-06
申请号:PE2011002176
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , ODDIE MAX EDWARD
Abstract: REFERIDO A UN METODO PARA DESARROLLAR UNA MINA SUBTERRANEA, QUE COMPRENDE: FORMAR UN POZO MINERO EXCAVANDO LA TIERRA PARA FORMAR UN AGUJERO QUE SE EXTIENDE HACIA ABAJO DESDE UNA REGION DE LA SUPERFICIE DE LA TIERRA; ELIMINAR EL MATERIAL EXCAVADO DESDE EL AGUJERO DURANTE LA FORMACION DEL POZO POR UN SISTEMA DE TRANSPORTE DE MATERIAL OPERABLE PARA TRANSPORTAR EL MATERIAL EXCAVADO HACIA ARRIBA A TRAVES DE UN AGUJERO A LA REGION DE LA SUPERFICIE DE LA TIERRA PARA DESCARGAR EN LA REGION DE LA SUPERFICIE; LANZAR UNO O MAS TUNELES DESDE UNA PARTE INFERIOR DEL POZO CUANDO SE FORMA EXCAVANDO HACIA FUERA DESDE EL POZO; Y ELIMINAR EL MATERIAL EXCAVADO EN LA EXCAVACION DEL TUNEL TRASNPORTANDO ESE MATERIAL DESDE EL TUNEL AL SISTEMA DE TRANSPORTE DE MATERIAL ESTABLECIDO DURANTE LA FORMACION DEL POZO Y LUEGO EXCAVANDO UN TUNEL O TUNELES DESDE LA CAVERNA
-
公开(公告)号:AU2011217748A1
公开(公告)日:2012-09-06
申请号:AU2011217748
申请日:2011-02-22
Applicant: TECH RESOURCES PTY LTD
Inventor: ODDIE MAX EDWARD , JONES COLIN IAN , LABRECQUE PIERRE , DELABBIO FREDRIC CHRISTOPHER
IPC: E21C41/22
Abstract: A method of block cave mining comprising excavating undercut tunnels (21) at an undercut level; drilling undercut blast holes (25) through the undercut tunnel roofs and setting and detonating explosive charges in those holes to blast rock above the undercut tunnels to initiate the formation of broken rock caverns (26) above the undercut tunnels (21); excavating extraction level tunnels (22) at an extraction level below the undercut level; drilling drawbell blast holes (33) upwardly from the extraction level tunnels at selected drawbell locations toward the broken rock caverns (26) and setting and detonating explosive charges in those holes to blast drawbells (32) through which broken rock falls down into the extraction level tunnels (22); and progressively removing such fallen rock from the drawbell locations through the extraction level tunnels (22); wherein some of the excavation is done mechanically by tunnel boring machinery.
-
公开(公告)号:CL2011003353A1
公开(公告)日:2012-06-22
申请号:CL2011003353
申请日:2011-12-29
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , ODDIE MAX EDWARD
Abstract: PARA DESARROLLAR UNA MINA SUBTERRÁNEA SE FORMA UN POZO DE MINA 80 EXCAVANDO LA TIERRA Y REMOVIENDO MATERIAL EXCAVADO DESDE EL POZO 80 POR UN SISTEMA DE TRANSPORTE DE MATERIAL QUE COMPRENDE CONTENEDORES 36 MOVIBLES HACIA ARRIBA Y ABAJO EN GUÍAS PARA CONTENEDORES DENTRO DEL POZO. LOS TÚNELES 82 SON LANZADOS DESDE UNA PARTE INFERIOR DEL POZO 80 EXCAVANDO UNA CAVERNA 81 EN LA CUAL UNA MÁQUINA PERFORADORA DE TÚNELES ES MONTADA Y OPERADA PARA PERFORAR TÚNELES 82. EL MATERIAL DE LA EXCAVACIÓN DEL TÚNEL ES TRANSPORTADO DESDE LOS TÚNELES POR MEDIO DE CINTAS TRANSPORTADORAS 87 AL SISTEMA DE TRANSPORTE DE MATERIAL ESTABLECIDOS DENTRO DEL POZO DURANTE LA FORMACIÓN DEL POZO EL CUAL ES OPERADO PARA TRANSPORTAR ESE MATERIAL A UNA REGIÓN DE LA SUPERFICIE DE TIERRA.
-
公开(公告)号:CA2765714A1
公开(公告)日:2011-01-06
申请号:CA2765714
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , ODDIE MAX EDWARD
Abstract: In developing an underground mine a mine shaft (80) is formed by excavating earth and removing excavated material from the shaft (80) by a material transport system comprising skips (36) movable up and down on skip guides within the shaft. Tunnels (82) are launched from a bottom part of shaft (80) by excavating a cavern (81) in which a tunnel boring machine is assembled and operated to bore the tunnels (82). Material from the tunnel excavation is transported from the tunnels via conveyor (87) to the material transport system established within the shaft during formation of the shaft which is operated to transport that material to an earth surface region.
-
-
-
-
-