-
21.
公开(公告)号:US20240309850A1
公开(公告)日:2024-09-19
申请号:US18576687
申请日:2022-07-05
Applicant: GFMS AS
Inventor: Jørgen Ranum KROKSTAD
IPC: F03D7/04 , B63B21/20 , B63B21/26 , B63B21/50 , B63B35/44 , B63B39/00 , B63B79/15 , F03D7/02 , F03D13/20 , F03D13/25
CPC classification number: F03D7/049 , B63B21/20 , B63B21/26 , B63B21/50 , B63B35/44 , B63B39/00 , B63B79/15 , F03D7/0204 , F03D13/201 , F03D13/256 , B63B2021/203 , B63B2035/446 , F05B2240/93 , F05B2240/95 , F05B2270/321
Abstract: A wind turbine support system configured to support an off-shore wind turbine, an offshore wind turbine farm and a method for controlling a floating offshore wind park with such turbine support system are described. The wind turbine support system includes: a floating body configured to hold a lower end of a tower of the wind turbine; and a single point mooring system. The single point mooring system includes a seabed anchor; and a mooring line configured to be connected to the seabed anchor at a first end thereof. The floating body has a bow and a stern, and the bow is configured to be connected to a second end of the mooring line.
-
公开(公告)号:US20240254963A1
公开(公告)日:2024-08-01
申请号:US18289259
申请日:2022-05-03
Applicant: Siemens Gamesa Renewable Energy A/S
Inventor: Johannes Gerhardes Wardjan Alberts , Sachin Tejwant Navalkar , Matteo Ravasio , Cornelia de Winter
CPC classification number: F03D7/0224 , F03D13/201 , F05B2260/70 , F05B2270/30
Abstract: A wind turbine is provided including: i) a tower; ii) a wind rotor, which is arranged at a top portion of the tower and which includes at least one blade, wherein the at least one blade is arranged in a first blade pitch position; and iii) a seismic event control device, configured to actuate the at least one blade from the first blade pitch position to a second blade pitch position, being different from the first blade pitch position, to thereby reduce seismic load acting on the wind turbine.
-
公开(公告)号:US20240240615A1
公开(公告)日:2024-07-18
申请号:US18015595
申请日:2021-07-13
Applicant: General Electric Company
Inventor: Pascal Meyer , Biao Fang , Norman Arnold Turnquist , Xiaopeng Li , Gregory Edward Cooper , Christopher James Kenny
IPC: F03D13/20
CPC classification number: F03D13/201 , F05B2240/912
Abstract: A tower structure particularly suited for a wind turbine includes a lower tower section formed of concrete and an upper tower section formed of steel. A transition system connects the upper tower section to the lower tower section, the transition system including a concrete component having a tubular wall with a base portion fixed on the lower tower section and a head portion connected to the upper tower section. The head portion extends radially outward beyond the upper tower section. A plurality of first tensioning tendons extend longitudinally at least partially through the tubular wall and are anchored to the concrete component at a top face of the head portion at locations radially outward of the upper tower section.
-
公开(公告)号:US12018645B2
公开(公告)日:2024-06-25
申请号:US18356270
申请日:2023-07-21
Applicant: General Electric Renovables Espana, S.L.
Inventor: Alexis Travers
CPC classification number: F03D13/205 , B23P19/12 , B25B27/16 , F03D13/112 , F03D13/20 , F03D13/201 , F05B2230/604 , Y10T29/4978 , Y10T29/53913
Abstract: The present disclosure is related to a device 100 configured for aligning a first hole 131 of a first flange 130 with a second hole 141 of a second flange 140. The device 100 comprises a base 101, a shaft 110 extending from the base 101 and a first and a second pusher 115, 116. The shaft 110 is configured to move between a retracted position and an extended position. The shaft 110 in the extended position extends from the first hole 131 into the second hole 141. The first and second pushers 115, 116 are also configured to be moved radially outwardly from the shaft 110 to exert pressure against an inner wall of the first and second holes 131, 141. Methods for aligning a first and a second hole 130, 140 are also provided.
-
公开(公告)号:US20240018944A1
公开(公告)日:2024-01-18
申请号:US18351845
申请日:2023-07-13
Applicant: General Electric Renovables Espana, S.L.
Inventor: Jaco NIES
CPC classification number: F03D80/501 , F03D13/201 , F05D2230/72
Abstract: The present disclosure relates to cabins (100) and methods (200, 300) for performing maintenance on wind turbines (10). A cabin (100) for performing maintenance on an uptower component (110) of a wind turbine (10) is provided. The cabin (100) is configured to support an operator and/or a tool inside the cabin (100). The cabin (100) is attachable to the wind turbine (10) such that it is rotatable with respect to the uptower component (110).
-
26.
公开(公告)号:US20230421041A1
公开(公告)日:2023-12-28
申请号:US18247732
申请日:2021-09-30
Applicant: VESTAS WIND SYSTEMS A/S
Inventor: Thomas Lundgren ANDERSEN , Morten LINDHOLM
CPC classification number: H02M1/0048 , H02M1/0009 , H02M1/0043 , H02M1/12 , H02M5/458 , F03D13/201
Abstract: The present invention relates a method for optimizing electrical current in a DC link busbar of a power converter system, wherein the power converter system comprises, a first inverter bridge, connected to the DC link busbar at a first end, the first inverter bridge having a first pulse width modulation signal, and a second inverter bridge, connected to the DC link busbar at a second end, the second inverter bridge having a second pulse width modulation signal, measuring a current flowing in the DC link busbar from the first end to the second end, optimizing the current flowing in the DC link busbar by delaying the first pulse width modulation signal and the second pulse width modulation signal from each other with a carrier delay, the invention also relates to power converter and wind turbine with optimizing electrical current in a DC link busbar.
-
-
-
-
-