-
公开(公告)号:US11286192B2
公开(公告)日:2022-03-29
申请号:US16824659
申请日:2020-03-19
Applicant: University of Science and Technology Beijing , Shengshi Weilan (Shandong) Environmental Science & Technology Co., Ltd.
Inventor: Yi Xing , Chen Hong , Yanxiao Si , Wei Su , Bo Jiang
Abstract: The present invention discloses a high-moisture sludge ultra-fine synchronizing deep-drying device and a method thereof. The device has a sludge ultrafine pulverizing unit and a sludge drying unit arranged horizontally in parallel, and a pulverized sludge discharge port arranged between them. The sludge ultrafine pulverizing unit comprises a sludge pulverizing chamber and a sludge feeding port, and the sludge pulverizing chamber is a hollow cylindrical structure with a pulverizing rotation shaft arranged in the center, and the pulverizing rotation shaft is provided with a sludge pulverizing impeller. The lower part of the sludge feeding port is provided with a first baffle and/or a second deflector. The sludge is pulverized into sludge powders in the sludge pulverizing chamber, and then fed into the sludge drying chamber to be fluidized and dried. The present invention has the advantage of high drying efficiency, etc.
-
公开(公告)号:US11180863B2
公开(公告)日:2021-11-23
申请号:US16612739
申请日:2019-03-27
Inventor: Shuqiang Jiao , Zhe Wang , Handong Jiao
Abstract: A device and a method for preparing pure titanium by electrolysis-chlorination-electrolysis, wherein the device includes a first electrolytic cell, a second electrolytic cell, a chlorination reactor and guide tubes. The Cl2 generated at the anode of the first electrolytic cell is introduced into a chlorination reactor containing the TiCxOy or TiCxOyNz raw materials via a guide tube, and a chlorination is carried out to generate TiCl4 gas at a temperature of 200° C.-600° C. The TiCl4 gas passes through a guide tube into a cathode of the second electrolytic cell, and then an electrolysis is performed to obtain the high-purity titanium in the second electrolytic cell. At the same time, the Cl2 generated at the anode of the second electrolytic cell is recycled into the chlorination reactor in the first electrolytic cell to continue to participate in the chlorination of TiCxOy or TiCxOyNz.
-
公开(公告)号:US20210356118A1
公开(公告)日:2021-11-18
申请号:US16335677
申请日:2017-11-30
Applicant: UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING
Inventor: Shengen Zhang , Lin Li , Bo Liu , Bolin Zhang
Abstract: A pure oxygen combustion method with a low nitrogen source is provided, relating to a technical field of thermal engineering. The method includes steps of: adopting a low nitrogen fuel, and adopting pure oxygen as a combustion-supporting gas; separately transporting the pure oxygen and the low nitrogen fuel; controlling a ratio of the pure oxygen to the low nitrogen fuel; and combusting tangentially in the pure oxygen in a combustion chamber, so as to realize deep burnout of the low nitrogen fuel and decrease CO and NOx emission concentrations. The present invention realizes nitrogen source reduction before combustion, reduces NOx emissions, and increases a thermal energy conversion efficiency of the fuel, without a flue gas de-nitrification device. Therefore, a NOx emission concentration is 5-100 mg/m3, a CO emission concentration is 50-500 mg/m3, and a combustion efficiency of the fuel is beyond 95%.
-
公开(公告)号:US20210355554A1
公开(公告)日:2021-11-18
申请号:US17124506
申请日:2020-12-17
Applicant: University of Science and Technology Beijing
Inventor: Rong ZHU , Bohan TIAN , Kai DONG , Guangsheng WEI , Rongfang SU
Abstract: A production apparatus and method for electric arc furnace steelmaking with a fully continuous ultra-short process are provided. A continuous adding, melting, smelting and continuous casting of a metal material are integrated, and a metallurgy process is completed in a flowing of a molten steel, to realize a continuous production of ingot blanks. The production apparatus includes four operation sites of an electric arc furnace for melting and primary refining, a sealed tapping chute for molten steel flowing, a refinement storage bed for molten-steel desulfurization and alloying and a conticaster for continuous casting A material flow, an energy flow and a time stream in the four operation sites are in a dynamic equilibrium. The production apparatus and method realize a molten-steel casting is started within 120 minutes after the metal material is started to be continuously added, and an uninterrupted continuous production is maintained for above 80 hours.
-
公开(公告)号:US20210327307A1
公开(公告)日:2021-10-21
申请号:US17227401
申请日:2021-04-12
Applicant: University of Science and Technology Beijing , China Railway Tunnel Consultants Co., Ltd. , Hebei Zhucheng Industrial and Mining Machinery Co., Ltd
Inventor: Xiaomin ZHOU , Yue ZHUO , Wenzhu MA , Wei LI , Yan XU , Yongsheng LIU , Xiaonan HE , Yue WANG , Yongdai WANG , Shiwu CAI , Guijiang WEI , Xin JIANG , Zhiyuan SHA
IPC: G09B23/40
Abstract: Provided are a multi-functional stratigraphic structure model testing system and testing method. The system includes a test piece testing device platform that includes a watertight fan-shaped closed cavity, a fluid-solid coupling loading system, and an anti-arc reaction frame system. A coupling loading system region consist of hydraulic (liquid) loading and multi-directional solid-skeleton loading onto a pore or crack test piece, which can be independently operated or combined with each other's. The fan-shaped closed cavity is fixed through the anti-arc reaction frame system, and a fan-shaped center region is provided with an application region of underground working face. The other two flat fan sides are provided with application regions of physical and chemical improvement for surrounding rock.
-
公开(公告)号:US20210238973A1
公开(公告)日:2021-08-05
申请号:US17149015
申请日:2021-01-14
Applicant: UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING
Inventor: WEIYAO ZHU , ZHIYONG SONG , JIANFA WU , SHOU MA , DEBIN KONG , MING YUE , ZHEN CHEN , YUBAO GAO
Abstract: The present disclosure provides a method and device for developing shale gas by tapered gradient pressure drop with multi-stage fractured horizontal well; the method comprises: acquiring fracturing crack form parameters of the multi-stage fractured horizontal well and reservoir characteristic parameters of nearby formation; dividing the formation near the shale gas multi-stage fractured horizontal well into strongly transformed area, weakly transformed area and matrix area; establishing pressure difference-flow models of gas-phase and water phase of the three areas respectively, and coupling the models of the three areas to establish production equation of the multi-stage fractured horizontal well; according to the production equation of the multi-stage fractured horizontal well, performing numerical simulation with different combinations of production pressure differences in the three stages of the multi-stage fractured horizontal well; and selecting a combination of production pressure differences with the greatest economic benefit as combination of production pressure differences.
-
公开(公告)号:US11035093B2
公开(公告)日:2021-06-15
申请号:US16950926
申请日:2020-11-18
Applicant: University of Science and Technology Beijing
Inventor: Fei Ma , Chun Jin , Yuchao Liu , Yanhua Shen , Lulu Gao
Abstract: A multi-degree-of-freedom automatic center-adjusting device, a hydraulic quick-coupling device, and rescue equipment are provided. The automatic center-adjusting device includes an active coupling valve set, a spring, and a dynamic adjustment swing rack. A first end of the dynamic adjustment swing rack is fixed to operation tools, and a second end of the dynamic adjustment swing rack is connected to the active coupling valve set through the spring. The dynamic adjustment swing rack includes a frame, a limit slot, and a spring limit cylinder, wherein the frame is used to support and fix the active coupling valve set, the limit slot is used to define a limit activity position of the active coupling valve set, and the spring limit cylinder is used to constrain the spring. The automatic center-adjusting device is used to solve technical problems of position errors and a center mismatch in a coupling process.
-
公开(公告)号:US20210134135A1
公开(公告)日:2021-05-06
申请号:US16820751
申请日:2020-03-17
Inventor: Xueqiu He , Dazhao Song , Shengquan He , Zhenlei Li , Yarong Xue , Anhu Wang , Hongwei Mu
Abstract: A multi-system, multi-parameter, integrated, comprehensive early warning method for a coal and rock dynamic disaster includes: obtaining monitoring data of a plurality of monitoring systems for the coal rock dynamic disaster, and extracting multivariate characteristic parameters capable of reflecting precursor information of the coal and rock dynamic disaster in each monitoring system based on the monitoring data; screening out a combination of characteristic parameters with a highest early warning effectiveness in each monitoring system and an optimal critical value of each characteristic parameter based on the multivariate characteristic parameters; calculating a comprehensive early warning index and an early warning effectiveness of each monitoring system; and calculating a multi-system comprehensive early warning result of the coal and rock dynamic disaster based on the comprehensive early warning index and the early warning effectiveness of each monitoring system.
-
公开(公告)号:US10947836B2
公开(公告)日:2021-03-16
申请号:US16941954
申请日:2020-07-29
Applicant: UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING
Inventor: Weiyao Zhu , Kun Huang , Jing Xia , Tongwen Jiang , Ming Yue , Kai Luo , Zhiyong Song , Baichuan Wang , Debin Kong
Abstract: The present invention provides a device and a method for measuring overburden of injected gas in cyclic gas injection development of condensate gas reservoir. The device comprises sand packed model and temperature control system. The temperature control system is nested outside the sand packed model. The sand packed model comprises sand pack cell, four gas inlets, four gas outlets, bracket, direction control component, rotating shaft, upper cover, lower cover, fixing bolts, two top pressuring inlets, pressure transmission rods, pressure transfer piston and multiple gas sampling ports. The sand pack cell can be filled with quartz sand of different particle size and composition, and the angle of the whole device is adjusted by the direction control component.
-
40.
公开(公告)号:US20210003742A1
公开(公告)日:2021-01-07
申请号:US17021099
申请日:2020-09-15
Applicant: UNIVERSITY OF SCIENCE AND TECHNOLOGY BEIJING
Inventor: WEIYAO ZHU , HE LIU , YUNFENG LIU , QINGLIN SHU , ZHIYONG SONG , MING YUE , ZENGLIN WANG , DEBIN KONG , AISHAN LI , BINGBING LI , GUODONG ZOU
Abstract: A simulation method for flow field of multi-stage fracturing on horizontal well in tight oil reservoir is provided. The tight oil reservoir comprises multiple horizontal wells with multi-stage fracturing, and for any horizontal well of the multiple horizontal wells, the method comprises: establishing a seepage mathematical model involving threshold pressure gradient according to reservoir physical property data and production data of the horizontal well, and determining formation pressure distribution of the horizontal well after multi-stage fracturing production according to the seepage mathematical model; determining formation pressure field distribution of the horizontal well after multi-stage fracturing production according to the formation pressure distribution and basing on principle of complex potential superposition; and establishing a criterion for identifying effective producing range of the horizontal well according to the formation pressure field distribution, and determining flow field range of the horizontal well according to the criterion.
-
-
-
-
-
-
-
-
-