-
公开(公告)号:KR100254391B1
公开(公告)日:2000-06-01
申请号:KR1019960044620
申请日:1996-10-08
Applicant: 고등기술연구원연구조합
IPC: F23K3/00
Abstract: PURPOSE: A coal gas complex electricity generation system is provided to stably operate by detecting and solving a bridging event. CONSTITUTION: A coal gas complex electricity generation system comprises a gas fire(10); plural hoppers(20); a nitrogen transporting pipe for high pressure transportation(30); a high pressure oxygen transporting pipe(40); a bridging detector and a bridging remover. The bridging detector detects that a fine powdered coal is not easily supplied into the nitrogen transporting pipe by loading the coal on a transferring screw(50). An orifice(60) is installed on the nitrogen transporting pipe(30). A first manometer(70) is installed in the orifice(60). A second manometer(80) is located between the hopper(20) and the gas fire(10) to measure a pressure inside the nitrogen transporting pipe(30) and the gas fire(10). The manometers(70,80) are connected with a computer(90) through a transmitter(91). The bridging remover is selectively operated by the pressure to be measured through the manometers(70,80).
Abstract translation: 目的:提供煤气复合发电系统,通过检测和解决桥接事件来稳定运行。 构成:煤气综合发电系统包括燃气(10); 多个料斗(20); 用于高压输送的氮气输送管(30); 高压氧气输送管道(40); 桥接检测器和桥接去除器。 桥接检测器检测到通过将煤装载在转印螺杆(50)上,不易将细粉煤供应到氮输送管中。 在氮气输送管(30)上安装有孔(60)。 第一压力计(70)安装在孔口(60)中。 第二压力计(80)位于料斗(20)和气体火焰(10)之间,以测量氮气输送管(30)和气体火焰(10)内的压力。 压力计(70,80)通过发射器(91)与计算机(90)连接。 桥接去除器通过压力计(70,80)的待测压力选择性地操作。
-
公开(公告)号:KR100234154B1
公开(公告)日:1999-12-15
申请号:KR1019970013699
申请日:1997-04-15
Applicant: 고등기술연구원연구조합
IPC: C10J3/20
Abstract: 본 발명은 석탄가스화기 시스템에 관한 것으로서, 메탄버너의 설치 위치를 슬랙탭의 하부측에 설치하여 예열버너의 위치와 같은 위치에서 동작되도록 함으로서, 메탄버너로 미분탄이 유입되지 않도록 하고, 또한 고온의 열로 인한 메탄버너의 손상을 방지하기 위한 석탄가스화기 시스템을 제공함에 그 목적이 있다.
본 발명은 상기의 목적을 달성하기 위해서 내부에 슬랙 탭이 설치되는 가스화기와 이 가스화기의 일측에 설치되는 예열버너 및 메탄버너로 구성되는 석탄가스화장치에 있어서, 가스화기의 슬랙 탭 하부측으로 가스화기의 외측에서 내측으로 내통되어 메탄버너화구가 형성되고, 메탄버너화구에 메탄버너가 설치되는 특징이 있다.-
公开(公告)号:KR1019990081152A
公开(公告)日:1999-11-15
申请号:KR1019980014942
申请日:1998-04-27
Applicant: 고등기술연구원연구조합
IPC: F23D14/00
Abstract: 본 발명은 버너 착탈장치에 관한 것으로서,
본 발명은 버너를 교체하거나 수리하기 위해 운전중인 가스화로에서 버너만을 이탈시키고, 그 가스화로에 상기 버너를 장착시키는 버너 착탈장치에 관한 것이다.
따라서, 본 발명에 의한 버너 착탈장치는 반응로 내부의 고압가스가 누출되는 것을 방지할 수 있는 유체 단속수단과, 상기 반응로 내·외부로 버너를 이송시킬 수 있는 버너이송수단으로 구성된 것을 특징으로 한다.-
公开(公告)号:KR1019980065211A
公开(公告)日:1998-10-15
申请号:KR1019970000078
申请日:1997-01-06
Applicant: 고등기술연구원연구조합
IPC: C10J3/20
Abstract: 본 발명은 석탄 가스화기장치에 관한 것으로서, 본 발명은 고압에서 운전되는 가스화기 내에서 승압버너를 이용하여 운전 압력까지 가스화기 예열 및 가압을 동시에 행하는 가스 운전 시스템을 제공함으로서, 기존의 미분탄과 산화제를 사용하는 방식에서 발생하는 막힘의 문제가 해결되도록 하고, 역압으로 인한 역화 현상이 없도록 하며, 승압 시간을 단축시킬 수 있도록 한 승압버너를 이용한 석탄 가스화기 가압장치를 제공함에 그 목적이 있다.
본 발명은 상기의 목적을 달성하기 위해서 가스화기, 예열버너로 구성되어 미분탄과 산화제의 불완전 연소에 의해 휘발성 물질을 얻기 위한 석탄 가스화기장치에 있어서, 가스화기 일측에 승압버너를 더 설치하고, 가스화기 운전 압력까지 승압버너를 이용하여 메탄과 산소를 연소시키며, 연소에 의하여 생성된 연소가스를 이용하여 가스화기 내부온도를 고온으로 유지하면서 운전 압력까지 가압 시키는 특징이 있다.-
公开(公告)号:KR1019970042964A
公开(公告)日:1997-07-26
申请号:KR1019950067445
申请日:1995-12-29
Applicant: 고등기술연구원연구조합
IPC: C10J3/20
Abstract: 예열버너를 사용하여 가스화기를 예열할 때, 급격한 가스화기의 예열에 따른 균열을 방지하기 위해, 석탄과 산소를 가열하여 가스로 변환시키기 위한 가스화기와, 상기 가스화기 예열시 급격한 예열을 방지하기 위해 공기를 공급하는 공기 흡입수단과, 상기 가스화기를 예열시키는 데 사용되는 예열버너부와, 상기 가스화기로부터의 연소가스를 배출하는 연소가스 배출수단과, 상기 가스화기와 연소가스 배출수단에 연결되어 상기 가스화기 내부의 압력을 조절하기 위한 공기 제어수단을 포함하는 가스화기 예열장치를 구성하여, 초기예열시 내화벽의 온도를 완만하게 증가시키도록 한다.
-
公开(公告)号:KR1019970042962A
公开(公告)日:1997-07-26
申请号:KR1019950067086
申请日:1995-12-29
Applicant: 고등기술연구원연구조합
IPC: C10J3/20
Abstract: 본 발명은 석탄가스화기의 슬랙 냉각장치를 개시한다. 개시된 장치는 물탱크의 상측에 형성된 배출구를 통해 오버플로우되는 물을 저장하는 저장탱크와, 상기 저장탱크에 저장된 물 속에 혼합된 슬렉입자를 필터링하는 필터와, 상기 필터에 의해 필터링된 물을 상기 보충수 공급펌프로 공급하며 콘트롤 밸브가 설치된 공급관과, 상기 저장탱크에 채워지는 물의 양을 감지하는 레벨 트랜스미터와, 상기 레벨 트랜스미터로부터 전송된 신호에 따라 콘트롤 밸브를 제어하는 콘트롤러를 포함하는 것을 특징으로 한다. 따라서 공업용수를 절감할 수 있게 되고, 슬렉입자로 인한 환경오염을 방지할 수 있게 된다.
-
公开(公告)号:KR100786573B1
公开(公告)日:2007-12-21
申请号:KR1020060070526
申请日:2006-07-27
Applicant: 고등기술연구원연구조합
Abstract: A slag tap cooling apparatus of a high temperature furnace is provided to prevent heat damage of a slag tap by cooling the slag tap intensively, and to remove hardened slag attached to the slag tap by increasing hardness of the slag. A slag tap cooling apparatus of a high temperature furnace comprises: a wall body(14) of a high temperature furnace, a melting reaction space part(12) formed in the wall body, a slag tap(18) and a cooling block(42). Molten slag(30) discharged from the melting reaction space part flows down along the upper surface of the slag tap. The cooling block is embedded in the part of the wall body where the slag tap is seated for cooling the slag tap. The cooling block is made of a material with high heat conductivity and includes a refrigerant circulation line(42a). A damping coating member(44) is provided between the cooling block and the wall body and damping heat-expansion behavior between different materials, thereby preventing breakdown of them.
Abstract translation: 提供一种高温炉的炉渣分离冷却装置,用于通过集中冷却炉渣抽渣来防止炉渣水龙头的热损伤,并且通过提高炉渣的硬度来除去附着在炉渣水槽上的硬化炉渣。 高温炉的炉渣抽出冷却装置包括:高温炉的壁体(14),形成在壁体中的熔化反应空间部分(12),炉渣分离器(18)和冷却块(42) )。 从熔融反应空间部分排出的熔渣(30)沿渣渣的上表面向下流动。 冷却块被嵌入在壁体的部分,炉渣排放器用于冷却炉渣水龙头。 冷却块由具有高导热性的材料制成并且包括制冷剂循环管线(42a)。 在冷却块和壁体之间设置阻尼涂层构件(44),并阻止不同材料之间的热膨胀行为,从而防止其破坏。
-
公开(公告)号:KR100536517B1
公开(公告)日:2005-12-14
申请号:KR1020030041520
申请日:2003-06-25
Applicant: 고등기술연구원연구조합
IPC: F23G5/00
Abstract: 본 발명은 용융로의 슬래그 배출장치에 관한 것이다.
본 발명의 슬래그 배출장치는, 상측단을 통하여 폐기물이 투입되어 용융되는 용융로 몸체와, 용융로 몸체의 일측으로 설치되어 복수개의 버너로 슬래그가 균질화되며, 그 내부에 적층되는 용융 슬래그의 최대 수위 감지를 위한 슬래그 레벨센서가 구비되는 균질화로와, 균질화로 하단의 배출구에 설치되어 적층되는 슬래그의 배출을 통제하는 배출수단과, 배출수단의 하부에 위치하여 균질화로에서 떨어지는 고온의 슬래그를 대기중에서 서서히 냉각시키는 서냉배출수단과, 배출수단 및 서냉배출수단을 제어하는 제어부를 포함한다. 따라서 컨베이어를 따라 이송되는 몰드에서 고온의 용융 슬래그를 서서히 냉각시키게 됨으로써, 강도가 매우 좋아진 고형화의 슬래그를 다양한 용도의 건설자재로 활용이 가능한 효과가 있다. 또한, 슬래그 배출장치가 간소화되어 생산 설비가 절감되는 효과가 있다.-
公开(公告)号:KR1020050005060A
公开(公告)日:2005-01-13
申请号:KR1020030044183
申请日:2003-07-01
Applicant: 고등기술연구원연구조합 , (주)대우건설
IPC: F23G5/50
Abstract: PURPOSE: A fixed bed waste gasification melting furnace and a gasification melting method are provided to perform preheating and gasification melting successively by the hybrid burner without interference with the sample layer, and to transmit radiant heat from flames efficiently by regulating the amount of oxygen supplied to the hybrid burner. CONSTITUTION: A vertical fixed bed waste gasification melting furnace(10) is composed of a body(20) inputting the sample waste, an upper melting furnace(30), a lower melting furnace(40) and a homogenizing furnace connected to the lower melting furnace. A nozzle part of a hybrid burner(80) comprises a first oxygen injection unit injecting oxygen from the center, a fuel injection unit installed outside the concentric circle of the first oxygen injection unit to inject fuel, a second oxygen injection unit installed outside the fuel injection unit to inject oxygen, and a control unit regulating fuel and oxygen supplied to the injection units. Plural hybrid burners are installed in the gasification melting furnace to perform preheating and gasification melting.
Abstract translation: 目的:提供固定床废气化熔化炉和气化熔化方法,通过混合燃烧器连续进行预热和气化,而不会干扰样品层,并通过调节供氧量的氧气有效传播火焰辐射热 混合燃烧器。 构成:垂直固定床废气熔化炉(10)由输入样品废物的主体(20),上熔化炉(30),下熔炉(40)和与低熔点 炉。 混合燃烧器(80)的喷嘴部分包括从中心喷射氧的第一氧气喷射单元,安装在第一氧气喷射单元的同心圆外侧以喷射燃料的燃料喷射单元,安装在燃料外部的第二氧气喷射单元 注入单元以注入氧气;以及控制单元,其调节供应到所述注射单元的燃料和氧气。 多个混合燃烧器安装在气化熔炉中进行预热和气化熔化。
-
公开(公告)号:KR100418177B1
公开(公告)日:2004-02-11
申请号:KR1020000075847
申请日:2000-12-13
Applicant: 고등기술연구원연구조합 , (주)대우
IPC: F23G5/00
Abstract: PURPOSE: A spray nozzle for a sludge incinerating melt furnace is provided to reduce manufacturing cost of the melt furnace by simplifying a control and supply system of sludge and oxidizer. CONSTITUTION: A spray nozzle(10) for a sludge incinerating melt furnace comprises a sludge spraying unit(11), a first oxidizer spraying unit(12), a second oxidizer spraying unit(13), a circulator(14), and a controller(15). The sludge spraying unit is installed on an upper portion of the sludge incinerating melt furnace body to spray sludge carried with transferring air from a sludge supply. The first and second oxidizer spraying units are coaxially installed inside and outside the sludge spraying unit to spray the first and second oxidizers. The circulator is installed between the sludge spraying unit and the second oxidizer spraying unit to circulate the sprayed oxidizers. The controller is installed to an end of the first oxidizer spraying unit to control a spraying angle of the sludge.
Abstract translation: 目的:通过简化污泥和氧化剂的控制和供应系统,提供用于污泥焚烧熔融炉的喷嘴以降低熔融炉的制造成本。 一种用于污泥焚烧熔融炉的喷嘴(10),包括污泥喷洒单元(11),第一氧化剂喷洒单元(12),第二氧化剂喷洒单元(13),循环器(14)和控制器 (15)。 污泥喷洒单元安装在污泥焚烧熔化炉体的上部,以喷洒来自污泥供应的输送空气的污泥。 第一和第二氧化剂喷射单元同轴地安装在污泥喷洒单元的内部和外部以喷洒第一和第二氧化剂。 循环器安装在污泥喷洒单元和第二氧化剂喷洒单元之间以循环喷洒的氧化剂。 控制器安装到第一氧化剂喷射单元的一端以控制污泥的喷射角度。
-
-
-
-
-
-
-
-
-