피시험장치 모의용 기상-부하 시뮬레이터
    31.
    发明公开
    피시험장치 모의용 기상-부하 시뮬레이터 有权
    天气模拟器

    公开(公告)号:KR1020110042859A

    公开(公告)日:2011-04-27

    申请号:KR1020090099716

    申请日:2009-10-20

    CPC classification number: G09B9/00 G01M99/007 G01W1/00 G09B23/00

    Abstract: PURPOSE: A weather-load simulator is provided to shorten a time for testing the performance of a system and development time by applying real driving conditions to the system. CONSTITUTION: A weather-load simulators(550) samples weather conditions and load conditions. The weather conditions include measured temperature, irradiation, and wind velocity. The load conditions include power, voltage, and current. A process unit processes the sampled information.

    Abstract translation: 目的:提供一种天气负载模拟器,通过将真实的驾驶条件应用于系统来缩短测试系统性能和开发时间的时间。 构成:天气负载模拟器(550)对天气条件和负载条件进行采样。 天气条件包括测量的温度,照射和风速。 负载条件包括功率,电压和电流。 处理单元处理采样信息。

    무변압기형 계통연계 태양광 발전 시스템의 전력변환장치
    32.
    发明授权
    무변압기형 계통연계 태양광 발전 시스템의 전력변환장치 有权
    一种用于并网无变压器型光伏发电系统的电力转换装置

    公开(公告)号:KR101027937B1

    公开(公告)日:2011-04-12

    申请号:KR1020080136916

    申请日:2008-12-30

    Abstract: 무변압기형 계통연계 태양광 발전 시스템의 전력변환장치에 대한 것으로, 전력변환장치를 구성하는 DC-DC 컨버터와 DC-AC 컨버터 사이의 DC 링크 전압을 태양전지어레이로부터 발생되는 출력 전력 정보를 이용하여 현재 발생되는 출력에 해당하는 전력이 계통으로 출력되도록 제어하는 무변압기 계통연계 태양광 발전 시스템의 전력변환장치에 대한 것이다.
    본 발명에 따른 무변압기형 계통연계 태양광 발전 시스템의 전력변환장치는 태양광을 직류전력으로 전환하는 태양전지어레이가 최대 출력점으로 운전하도록 최대 출력점 제어를 수행하고, 태양전지어레이에서 발생된 직류전압을 승압 또는 강압하여 출력하는 DC-DC 컨버터; 상기 DC-DC 컨버터에서 출력된 전압을 상용 주파수의 교류전력으로 변환하여 배전 계통으로 출력하는 DC-AC 컨버터;를 포함하되, 상기 DC-AC 컨버터는 배전계통전압정보와 배전계통전류정보를 이용하여 상기 DC-AC 컨버터의 출력전류를 제어하기 위한 제어값을 출력하는 제어값 출력 모듈과, 상기 태양전지어레이의 출력전력과 배전계통전압정보를 이용하여 전류기준값을 출력하는 전류기준값 출력 모듈과, 상기 DC-AC 컨버터에 입력되는 전압정보 및 미리 설정된 운전범위정보를 이용하여 보상전류기준값을 계산하는 DC전압제한 모듈과, 상기 전류기준값과 보상전류기준값 및 상기 제어값 출력 모듈의 제어값을 이용하여 DC-AC 컨버터의 출력전력을 제어하는 전류제어 모듈을 포함한다.
    본 발명에 따른 무변압기형 계통연계 태양광 발전 시스템의 전력변환장치는 전류의 고조파를 저감시키고, 외부 환경 조건의 변화에 의해서 계통 출력이 급격하게 변화하지 않으며, 시스템의 동작 안정성을 확보할 수 있는 효과가 있다.
    태양전지어레이, 전력변환장치, 무변압기형, DC/AC 컨버터

    열병합 발전시스템을 고려한 마이크로그리드 운전 제어방법및 장치
    33.
    发明授权
    열병합 발전시스템을 고려한 마이크로그리드 운전 제어방법및 장치 有权
    微电网运行控制方法与装置综合考虑热电厂

    公开(公告)号:KR101015047B1

    公开(公告)日:2011-02-16

    申请号:KR1020090004932

    申请日:2009-01-21

    Abstract: 마이크로그리드를 경제적으로 운영하기 위해서는 각 시점의 부하를 고려하여 전력계통에서 전력을 구매하거나, 혹은 자체 분산전원을 발전하여 전력을 판매할 수 있다. 이때, 마이크로그리드 운영자 입장에서는 최대의 이익을 얻기 위해서 부하, 전력 구매 및 판매가격, 열병합 시스템 발전비용을 비교하여 가장 유리한 방향으로 열병합 발전의 출력을 조정하여야 한다. 본 발명에서는 온라인상에서 열병합 발전 설비를 고려한 마이크로그리드의 최적운전 방법을 제안하였다.
    열병합 발전, 마이크로그리드, 최적 운전

    출력안정화형 풍력발전 시스템 및 그 제어방법
    34.
    发明公开
    출력안정화형 풍력발전 시스템 및 그 제어방법 有权
    使用能源储存装置的功率调节风力发电系统及其控制方法

    公开(公告)号:KR1020100064492A

    公开(公告)日:2010-06-15

    申请号:KR1020080122945

    申请日:2008-12-05

    CPC classification number: Y02E10/723 F03D7/02 F03D7/00

    Abstract: PURPOSE: A power conditioning wind power generation system using an energy storage device and a control method thereof are provided to achieve optimum charge/discharge of the energy storage device through real-time output monitoring for a wind power generation device. CONSTITUTION: A power conditioning wind power generation system comprises a wind power generation device(100), an integrated control unit(500), and an energy storage device(400). The integrated control unit determines an output command value of the energy storage device in order to reduce changes in output and compensate frequency of the wind power generation device. The energy storage device absorbs and discharges electric power according to the output command value of the integrated control unit using previously stored energy. The energy storage device includes a power conversion device and one of a battery, a superconductive storage unit, a flywheel, and a super capacitor.

    Abstract translation: 目的:提供一种使用储能装置及其控制方法的功率调节风力发电系统,通过风力发电装置的实时输出监控来实现能量储存装置的最佳充放电。 构成:一种功率调节风力发电系统,包括风力发电装置(100),综合控制单元(500)和能量存储装置(400)。 集成控制单元确定能量存储装置的输出指令值,以便减少风力发电装置的输出变化和补偿频率。 能量存储装置使用先前存储的能量根据集成控制单元的输出指令值吸收和放电。 能量存储装置包括电力转换装置和电池,超导存储单元,飞轮和超级电容器之一。

    전력 계통의 운전 예비력 공급시스템 및 그 제어방법
    35.
    发明公开
    전력 계통의 운전 예비력 공급시스템 및 그 제어방법 有权
    电力系统中的操作保留电源系统及其控制方法

    公开(公告)号:KR1020100060725A

    公开(公告)日:2010-06-07

    申请号:KR1020080119448

    申请日:2008-11-28

    CPC classification number: H02J9/06 H02J2009/068 Y02E70/40

    Abstract: PURPOSE: An operation reserve supply system of an electric power system and a control method thereof are provided to extend a replacement period of an energy storage device by reducing the frequencies of charge/discharge operations of the energy storage device. CONSTITUTION: A plurality of DC/DC converters(20) is connected to an energy storage device(10) in serial/parallel. An energy storage device is one of a battery, a super capacitor, and a super conductive storage device. A DC/AC inverter(30) transfers the output inputted from the DC/DC converter to the electric power system. A controller(40) generates a first frequency operation reserve power in the malfunction of the system. The controller includes a voltage controller, a frequency reserve controller, a phase controller, and a switching controller.

    Abstract translation: 目的:提供一种电力系统的运行备用供应系统及其控制方法,通过减少储能装置的充放电运行频率来延长储能装置的更换周期。 构成:多个DC / DC转换器(20)串联/并联连接到能量存储装置(10)。 能量存储装置是电池,超级电容器和超导电存储装置之一。 DC / AC逆变器(30)将从DC / DC转换器输入的输出传送到电力系统。 控制器(40)在系统的故障中产生第一频率操作预留功率。 控制器包括电压控制器,频率预约控制器,相位控制器和开关控制器。

    단상 전원으로부터 3상의 전압 및 전류 값들을 모의하는방법 및 이를 이용한 단상용 분산 발전 시스템에서의 전력변환 장치를 제어하는 장치

    公开(公告)号:KR1020080034527A

    公开(公告)日:2008-04-22

    申请号:KR1020060100553

    申请日:2006-10-17

    Abstract: A method of simulating a three-phase voltage and a three-phase current from one-phase power and an apparatus for controlling a power converter in a one-phase distribution generation system are provided to overcome a limitation of a frequency response of an alternating current control system and a difficulty in independent control of effective power or reactive power. A method of simulating a three-phase voltage(92) and a three-phase current(93) from one-phase power includes the steps of: (a) sampling a current(91) outputted from the one-phase power and a voltage(90) of a power system electrically connected to the one-phase power; and (b) extracting three-phase voltage component values and current component values based on sampling voltage values and current values sampled in the step(a). The step(b) includes the steps of: (b-1) storing the sampling voltage values and current values detected in the step (a) for more than one cycle of the power-based voltage; and (b-2) selecting voltage values and current values earlier than and later than the voltage by 1/3 cycle from the stored voltage values and current values. Two look-up tables(97,98) for the current and the voltage are applied so as to simulate three phases from one-phase input values.

    Abstract translation: 提供了从单相电源模拟三相电压和三相电流的方法以及用于控制单相分配发电系统中的功率变换器的装置,以克服交流电的频率响应的限制 控制系统和独立控制有效功率或无功功率的难度。 从单相功率模拟三相电压(92)和三相电流(93)的方法包括以下步骤:(a)对从一相电力输出的电流(91)和电压 (90),电连接到所述单相电力; 和(b)基于在步骤(a)中采样的采样电压值和电流值提取三相电压分量值和电流分量值。 步骤(b)包括以下步骤:(b-1)存储步骤(a)中检测到的取样电压值和电流值,用于多于一个电源电压的周期; 和(b-2)从存储的电压值和电流值中选择比电压早于或晚于电压1/3周期的电压值和电流值。 施加用于电流和电压的两个查找表(97,98),以便从单相输入值模拟三相。

    태양광 발전시스템의 적정 설치용량을 산정하는 방법
    37.
    发明授权
    태양광 발전시스템의 적정 설치용량을 산정하는 방법 失效
    计算太阳能电池发电系统所有装机容量的方法

    公开(公告)号:KR100816531B1

    公开(公告)日:2008-03-27

    申请号:KR1020060064657

    申请日:2006-07-11

    Abstract: 본 발명은 계통연계형 태양광 발전시스템에 관한 것으로서, 전력미거래 수용가에 태양광 발전시스템을 설치하는 경우에 적정 설치용량을 산정함으로써, 태양광 발전시스템이 기존 상용전력계통과 연계 구성하여 자가용 수용가에 원활한 전력을 공급할 수 있는 태양광 발전시스템의 적정 설치용량을 산정하는데 그 목적이 있다.
    이러한 특징적인 목적을 달성하기 위한 본 발명은, (a) 수용가의 전체 전력사용량을 확인하는 단계; (b) 전체 전력사용량에 따른 최소 및 최대부하를 비교·분석하는 단계; (c) 태양광 발전전력보다 큰 값인지를 판단하는 단계; (d) 상기 제 (c) 단계의 판단결과, 상기 최소부하가 상기 태양광 발전전력보다 큰 값인 경우에 적정 설치용량을 선정하는 단계; 및 (e) 상기 제 (c) 단계의 판단결과, 상기 최소부하가 상기 태양광 발전전력보다 작은 값인 경우에 상기 태양광 발전전력이 역송전되지 않도록 방지하는 단계; 로 구성된다.
    태양전지, 태양광 발전시스템, 역송전, 상용전력계통, 적정 설치용량

    태양광 발전시스템의 적정 설치용량을 산정하는 방법
    38.
    发明公开
    태양광 발전시스템의 적정 설치용량을 산정하는 방법 失效
    用于计算太阳能电池发电系统的安装容量的方法

    公开(公告)号:KR1020080006028A

    公开(公告)日:2008-01-16

    申请号:KR1020060064657

    申请日:2006-07-11

    CPC classification number: G06Q50/06 G01R11/32

    Abstract: A method for computing an optimal installation capacity of a solar cell generation system is provided to enable the solar cell generation system to supply electric power to a self-generation house smoothly in connection with a usual commercial power system by computing the optimal installation capacity when the solar cell generation system is installed to the self-generation house. Total electric power usage of the self-generation house is checked(S2). Minimum and maximum load according to the total electric power usage is compared and analyzed(S6). It is checked whether or not the minimum load is bigger than the electric power generated from the solar cell generation system(S10). The optimal installation capacity is computed when the minimum load is bigger than the electric power generated from the generation system(S12). Inverse power transmission of the electric power generated from the solar cell generation system is prevented when the minimum load is smaller than the electric power generated from the generation system(S14).

    Abstract translation: 提供了一种用于计算太阳能电池发电系统的最佳安装容量的方法,以使得太阳能电池发电系统能够通过计算最佳的安装能力,通过计算最佳的安装容量来平稳地向自发电屋提供电力 太阳能电池发电系统安装在自发电厂房屋内。 检查自发房屋的总用电量(S2)。 对总用电量的最小和最大负载进行比较和分析(S6)。 检查最小负载是否大于从太阳能电池发电系统产生的电力(S10)。 当最小负载大于从发电系统产生的电力时,计算最佳安装容量(S12)。 当最小负载小于从发电系统产生的电力时,防止从太阳能电池发电系统产生的电力的逆电传输(S14)。

    태양광발전시스템의 최적 설계 시스템 및 제어방법
    39.
    发明授权
    태양광발전시스템의 최적 설계 시스템 및 제어방법 有权
    用于优化设计太阳能电池发生系统的系统及其控制方法

    公开(公告)号:KR100794195B1

    公开(公告)日:2008-01-11

    申请号:KR1020060067831

    申请日:2006-07-20

    CPC classification number: H02S50/00 H02S40/32 H02S40/38 Y02E10/563

    Abstract: A system for optimizing a solar cell generating system and a control method thereof are provided to effectively install and manage the solar cell generating system by determining an installation scheme of the solar cell generating system according to a condition that a power supply company prepares or do not prepare a power line. A system for optimizing a solar cell generating system includes an installation type selecting unit(100), a relay capacity calculating unit(200), a stand-alone capacity calculating unit(300), an orientation angle calculator unit(400), a database unit(500), and a controlling unit(600). The installation type selecting unit determines an installation scheme from a stand-alone type and a relay type based on an existence of a power line from a power supply company. The relay capacity calculating unit calculates capacities of the solar cell generating system and a solar cell module. The stand-alone capacity calculating unit calculates an overall load applied on a coverage of the solar cell generating system. The orientation angle calculator unit calculates a maximum output value of the solar cell generating system according to the calculated result from the calculating units.

    Abstract translation: 提供一种用于优化太阳能电池产生系统的系统及其控制方法,以通过根据供电公司准备或不做的条件确定太阳能电池产生系统的安装方案来有效地安装和管理太阳能电池产生系统 准备一条电源线。 一种用于优化太阳能电池产生系统的系统,包括安装型选择单元(100),中继容量计算单元(200),独立容量计算单元(300),定向角计算单元(400),数据库 单元(500)和控制单元(600)。 安装型选择单元基于来自电力供应公司的电力线路的存在,从独立型和继电器型确定安装方案。 继电器容量计算单元计算太阳能电池产生系统和太阳能电池模块的容量。 独立容量计算单元计算施加在太阳能电池产生系统的覆盖范围上的总负载。 取向角计算部根据计算单位的计算结果,算出太阳能电池生成系统的最大输出值。

    하이브리드 분산발전 시스템을 이용한 운전 제어방법
    40.
    发明公开
    하이브리드 분산발전 시스템을 이용한 운전 제어방법 失效
    混合分布式生成系统及其方法

    公开(公告)号:KR1020080001828A

    公开(公告)日:2008-01-04

    申请号:KR1020060060198

    申请日:2006-06-30

    CPC classification number: Y02E10/563

    Abstract: A hybrid distributed generation system and a control method therefor are provided to stably supply power to an electrical apparatus by separating a diesel generation system from a regeneration energy system. A first distributed power portion(110) converts DC power from a wind generator(wt) and a solar cell(pv) to a maximum power. An inverter unit(120) converts the DC power which is supplied from a DC common line from the first distributed power portion, to an AC portion. A second distributed power portion(130) includes a diesel engine and a driving synchronous generator. A unified controller(140) is coupled with the first and second distributed power portions and the inverter unit, and controls the components. The AC power from the inverter unit and the output power from the second distributed power portion are supplied to an AC common line and delivered to a load(L).

    Abstract translation: 提供了一种混合分布式发电系统及其控制方法,用于通过将柴油发电系统与再生能量系统分离来稳定地向电气设备供电。 第一分布式动力部分(110)将来自风力发电机(wt)和太阳能电池(pv)的DC功率转换为最大功率。 逆变器单元(120)将从第一分配功率部分的直流公共线提供的直流电力转换为交流部分。 第二分配动力部分(130)包括柴油发动机和驱动同步发电机。 统一控制器(140)与第一和第二分配电力部分和逆变器单元耦合,并且控制组件。 来自逆变器单元的交流电力和来自第二分布式电力部分的输出功率被提供给AC公共线并被传送到负载(L)。

Patent Agency Ranking