-
公开(公告)号:CA2912479A1
公开(公告)日:2014-12-11
申请号:CA2912479
申请日:2014-06-06
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , DELABBIO FREDRIC CHRISTOPHER
Abstract: A variable length guide system for guiding a conveyance along a mineshaft, the variable length guide system extending downwardly from a work stage and being extendable or retractable to accommodate changes in distance between the work stage and a lower region of a mineshaft.
-
公开(公告)号:PE20121376A1
公开(公告)日:2012-10-15
申请号:PE2011002185
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , MEDD MORRIS JAMES , GOUGH RYAN GEORGE , DE LA VERGNE JOHN NICHOLAS , FEARN ANDY ROBERT , DELABBIO FREDRIC CHRISTOPHER
IPC: E21D1/03
Abstract: PARA FORMAR UN PIQUE DE LA MINA PARA UNA MINA SUBTERRANEA, LA TIERRA EXCAVADA POR UNA MAQUINA DE PERFORACION ES TRANSPORTADA HACIA ARRIBA MEDIANTE EL MANEJO DE LA UNIDAD HACIA UNA ESTACION DE TRANSFERENCIA, DONDE ES TRANSFERIDA DENTRO DE CAJONES, LOS CUALES SON IZADOS Y DESCENDIDOS A LO LARGO DE LAS GUIAS DE LOS CAJONES, DENTRO DEL AGUJERO DEL PIQUE, PARA EL TRANSPORTE DEL MATERIAL EXCAVADO HACIA UNA REGION EN LA SUPERFICIE DE LA TIERRA. LA ESTACION DE TRANSFERENCIA ES MOVIDA HACIA ABAJO CUANDO AVANZA LA EXCAVACION
-
公开(公告)号:MX2012000112A
公开(公告)日:2012-02-29
申请号:MX2012000112
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , WEBB ROCKY LYNN , MEDD MORRIS JAMES , GOUGH RYAN GEORGE , VERGNE JOHN NICHOLAS DE LA , FEARN ANDY ROBERT
IPC: E21D1/03
Abstract: En la formación de un pozo de mina para una mina subterránea, la tierra excavada por una máquina de perforación (21) es transportada hacia arriba mediante la unidad de manejo (22) hacia una estación de transferencia (33), donde es transferida dentro de contenedores 36, los cuales son elevados y descendidos a lo largo de las guías de contenedor 38, dentro del orificio del pozo (19), para el transporte del material excavado hacia una región en la superficie de la tierra. La estación de transferencia (33) es movida hacia abajo cuando avanza la excavación.
-
公开(公告)号:MX2012000111A
公开(公告)日:2012-02-29
申请号:MX2012000111
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , ODDIE MAX EDWARD
Abstract: Para desarrollar una mina subterránea se forma un pozo de mina 80 excavando la tierra y removiendo material excavado desde el pozo 80 por un sistema de transporte de material que comprende contenedores 36 movibles hacia arriba y abajo en guías para contenedores dentro del pozo. Los túneles 82 son lanzados desde una parte inferior del pozo 80 excavando una caverna 81 en la cual una máquina perforadora de túneles es montada y operada para perforar túneles 82. El material de la excavación del túnel es transportado desde los túneles por medio de cintas transportadoras 87 al sistema de transporte de material establecidos dentro del pozo durante la formación del pozo el cual es operado para transportar ese material a una región de la superficie de tierra.
-
公开(公告)号:AU2010268762A1
公开(公告)日:2012-01-19
申请号:AU2010268762
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , ODDIE MAX EDWARD
Abstract: In developing an underground mine a mine shaft (80) is formed by excavating earth and removing excavated material from the shaft (80) by a material transport system comprising skips (36) movable up and down on skip guides within the shaft. Tunnels (82) are launched from a bottom part of shaft (80) by excavating a cavern (81) in which a tunnel boring machine is assembled and operated to bore the tunnels (82). Material from the tunnel excavation is transported from the tunnels via conveyor (87) to the material transport system established within the shaft during formation of the shaft which is operated to transport that material to an earth surface region.
-
公开(公告)号:CA2789896A1
公开(公告)日:2011-08-25
申请号:CA2789896
申请日:2011-02-22
Applicant: TECH RESOURCES PTY LTD
Inventor: ODDIE MAX EDWARD , JONES COLIN IAN , DELABBIO FREDRIC CHRISTOPHER , LABRECQUE PIERRE
IPC: E21C41/22
Abstract: A method of block cave mining comprising excavating undercut tunnels (21) at an undercut level; drilling undercut blast holes (25) through the undercut tunnel roofs and setting and detonating explosive charges in those holes to blast rock above the undercut tunnels to initiate the formation of broken rock caverns (26) above the undercut tunnels (21); excavating extraction level tunnels (22) at an extraction level below the undercut level; drilling drawbell blast holes (33) upwardly from the extraction level tunnels at selected drawbell locations toward the broken rock caverns (26) and setting and detonating explosive charges in those holes to blast drawbells (32) through which broken rock falls down into the extraction level tunnels (22); and progressively removing such fallen rock from the drawbell locations through the extraction level tunnels (22); wherein some of the excavation is done mechanically by tunnel boring machinery.
-
公开(公告)号:CA2920864C
公开(公告)日:2022-04-19
申请号:CA2920864
申请日:2014-08-25
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , DELABBIO FREDRIC CHRISTOPHER
Abstract: A conveyance system for moving a conveyance along a mine shaft during shaft construction, comprising: a first guide section; a second guide section located along the mineshaft in series with the first guide section, the conveyance being movable along the first guide section; and a head section for receiving the conveyance, the head section cooperating with the first guide section to enable the conveyance to travel from the second guide section along the first guide section when received by the head section.
-
公开(公告)号:ES2902703T3
公开(公告)日:2022-03-29
申请号:ES10793426
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , ODDIE MAX EDWARD
Abstract: Un método para desarrollar una mina subterránea, que comprende: formar un pozo de mina excavando tierra debajo de una jaula de trabajo para formar un agujero (19) que se extiende hacia abajo desde una región de superficie de tierra; retirar material excavado del agujero (19) durante la formación del pozo de mina mediante una unidad de manejo de material (22) que puede operar para transportar el material excavado hacia arriba a través del agujero (19) a la región de superficie de la tierra para descargarlo en la región de superficie; en donde la unidad de manejo de material (22) comprende uno o más cajones (36) que se pueden mover arriba y abajo sobre guías de cajones dentro del agujero (19), y en donde la unidad de manejo de material (22) comprende una estación de transferencia (33) en la que el material excavado en la formación del pozo se transfiere al cajón (36) o cajones (36) para su transporte a la región de superficie y la estación de transferencia se mueve hacia abajo a medida que avanza la excavación, caracterizado por las etapas de: formar dicho pozo de mina excavando la tierra debajo de una jaula de trabajo (31) y dicha estación de transferencia de material (33) se monta en la jaula de trabajo (31), ubicar la jaula de trabajo (31) y la estación de transferencia de material (33) en una parte inferior (80) del pozo de mina; abrir uno o más túneles (82) desde la parte inferior (80) del pozo de mina, y retirar el material excavado en la excavación del túnel transportando ese material desde el túnel a la unidad de manejo de materiales (22) y operando ese sistema (22) para transportar el material a la región de superficie, en donde una vez finalizada la formación del pozo, la estación de transferencia de material (33) está en o cerca del fondo del pozo de mina y el material de excavación de túnel se alimenta a la estación de transferencia de material (33) en el cajón (36) o cajones (36).
-
公开(公告)号:RU2686260C2
公开(公告)日:2019-04-24
申请号:RU2015152499
申请日:2014-06-06
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , DELABBIO FREDRIC CHRISTOPHER
Abstract: Изобретениеотноситсяк подъемномуоборудованиюшахтногоствола. Подъемнаясистемадляподъемаподъемногососудаизшахтногостволасодержит: надшахтныйкопер, установленныйнадшахтнымстволом, подъемник, соединенныйс подъемнымсосудомудлиненнымгибкимподъемнымэлементомдляподъемаподъемногососудаизшахтногостволасматываниемподъемногоэлемента, верхнийаварийныйбарьер, находящийсянанадшахтномкопре, выполненныйс возможностьюзацепленияподъемнымсосудомдляпредотвращениядвиженияподъемногососудавверхзааварийныйбарьерв состояниипереподъема, иверхнийзамедлительподъемногососуда, выполненныйс возможностьюзамедлениядвиженияподъемногососудавверхприегоприближениик аварийномубарьеру. Подъемнаясистемавходитв составустройстваудалениядобытогоматериалаизшахтногоствола. Верхнийаварийныйбарьер, верхнийзамедлительподъемногососудаи ловительподъемногососудаобразуютзащитноеустройство. Изобретениеобеспечиваетповышениебезопасностиработв шахтномстволе. 5 н. и 30 з.п. ф-лы, 13 ил.
-
公开(公告)号:CA2789896C
公开(公告)日:2018-05-29
申请号:CA2789896
申请日:2011-02-22
Applicant: TECH RESOURCES PTY LTD
Inventor: ODDIE MAX EDWARD , JONES COLIN IAN , DELABBIO FREDRIC CHRISTOPHER , LABRECQUE PIERRE
IPC: E21C41/22
Abstract: A method of block cave mining comprising excavating undercut tunnels (21) at an undercut level; drilling undercut blast holes (25) through the undercut tunnel roofs and setting and detonating explosive charges in those holes to blast rock above the undercut tunnels to initiate the formation of broken rock caverns (26) above the undercut tunnels (21); excavating extraction level tunnels (22) at an extraction level below the undercut level; drilling drawbell blast holes (33) upwardly from the extraction level tunnels at selected drawbell locations toward the broken rock caverns (26) and setting and detonating explosive charges in those holes to blast drawbells (32) through which broken rock falls down into the extraction level tunnels (22); and progressively removing such fallen rock from the drawbell locations through the extraction level tunnels (22); wherein some of the excavation is done mechanically by tunnel boring machinery.
-
-
-
-
-
-
-
-
-