Abstract:
PURPOSE: A distribution automation sever and method which supports the failure recovery of a distribution line are provided to automatically switch and restore a failed section by using failure display information transmitted from an electric power substation breaker, a distribution line breaker, and an opening and closing switch. CONSTITUTION: An electric power substation shearing process part(130) processes a signal received from an electric power substation breaker(10) and a failure display part included in the electric power substation breaker. A distribution line shear process part(140) processes a signal received from a distribution line breaker(30) and a failure display part included in the signal received from a distribution line breaker. An automatic failure treatment part(110) grasps failure situations by using the signal received from the electric power substation breaker or the distribution line breaker as a reference signal. An automatic sectional load calculation part(120) calculates the load of a failure section in order to process malfunctions according to failure type which is grasped in the automatic failure treatment part.
Abstract:
PURPOSE: Transaction encoding and decoding methods and a system in a power network are provided to effectively reduce a load of system by reducing a coding object while applying a security solution based on a transaction. CONSTITUTION: A transaction serial number is initialized(S100). Transmission data included in the transaction is created. Whether the transmission data is a coding object or not is determined(S120). The transaction serial number is added to the header of a coding object transmission data(S130). A encryption code is obtained from a transmission node or an external server(S140). The coding object transmission data is encrypted using the encryption code(S150). The transmission data is transmitted in a receiving node which receives the transaction(S160).
Abstract:
본 발명은 실제 각 부하 단에서의 무효 전압이 보상될 수 있도록 전압 제어장치의 설정을 적절히 변경함으로써 수요자에게 안정적으로 전압을 공급할 수 있도록 하는 새로운 배전 자동화 시스템 및 그의 전압 제어방법에 관한 것으로서, 배전계통을 구성하는 각 노드 및 배전선로의 연결 형태에 따라 4단자 정수법(constants of four terminals)을 적용하여 분포부하의 형태로 배전계통을 모델링 하는 제 1 단계; 인접한 노드의 전류 값으로부터 해당 노드에서의 전압 크기를 추정하기 위한 수식을 확정하는 제 2 단계; 상기 제 2 단계에서 확정된 수식을 통해 산출된 전압 크기 값 및 이를 제어하기 위한 제어변수를 포함하는 목적함수를 확정하는 제 3 단계; 및 확정된 상기 목적함수가 최소값을 갖도록 하는 상기 제어변수의 값을 산출하고, 산출된 값을 상기 배전계통의 중앙에서 각 전압제어장치에 적용하는 제 4 단계를 포함한다. 배전 계통, 전력조류, 전압제어, 배전자동화 시스템
Abstract:
PURPOSE: A method and a system for determining a position of a switch, and a recording medium including the same are provided to reduce switch installation costs by selecting a balanced load place as an installation position of an automatic switch. CONSTITUTION: A section load quantity calculator(100) calculates a load quantity at a section divided by a switch. A normal opening point selector(300) selects a normal opening point by moving a virtual position at a start point of a distribution line one section by one section. A balanced load calculator(400) sets a balanced load point by squaring the section load quantity of each section An automatic switch installation position selector(500) sets one of the normal opening points as the installation position of the automatic switch.
Abstract:
A system and a method for intelligent distribution automation are provided to integrate an equipment management, a client management and a TCS(Trouble Call System) and to offer an integrated feeder management function linked with an ARM system. An SCADA(Supervisory Control and Data Acquisition)/DMS(Distribution Management System) sever(20) which is connected to a middleware(28) performs a feeder intellectualization management, and constructs initial data. A GIS sever(21) which is connected to the middleware manage a GIS facility, a client and a TSC. A history sever(22) connected to the middleware manages history information. A simulator(23) connected to the middleware performs the simulation handling of the feeder intellectualization, and an HMI(Human Machine Interface)(24) displays a screen of a transformer substation on a screen of a feeder line. FEPs(25,26,27) performs a front/end processing operation in a distributed generation, the feeder line and the substation.
Abstract:
본 발명은 한국 전력 사업소의 시험자 및 피시험자들이 실제 배전 자동화 시스템을 운영하기 전에 거의 실제의 배전 계통과 유사한 실시간 배전 계통 시뮬레이터를 이용하여 훈련할 수 있는 배전 자동화 교육 시스템 및 그의 구동 방법을 제공하는 것이다. 본 발명에 따른 배전 자동화 교육 시스템의 구동 방법은 시험자가 실시간 배전 계통 시뮬레이터를 통해 실제의 배전 계통에서 발생하는 가상 고장 신호를 생성하는 단계와; 상기 가상 고장 신호를 배전 자동화 시스템의 입력 신호에 맞게 변환하는 단계와; 상기 가상 고장 신호에 의한 배전 자동화 시스템의 고장 상태를 피시험자가 정상 상태로 조절하는 제어 신호를 생성하는 단계와; 상기 제어 신호를 상기 실시간 배전 계통 시뮬레이터의 입력 신호에 맞게 변환하는 단계를 포함하는 것을 특징으로 한다.
Abstract:
본 발명은 원자로 내부의 다수 중성자 분포 데이터를 취득하여 원자로가 정상적으로 구동될 수 있도록 하는 원자로 핵계측 계통의 운전제어시스템을 개방적이고 표준화된 시스템으로 구현하여 정비와 업그레이드가 용이하도록 하고, GUI(Graphic User Interface) 방식의 운전 인터페이스를 제공하고 이벤트 구동(Event Driven) 방식으로 구동되는 운용프로그램으로써 자동운전 기능뿐만 아니라 운전 상태의 진단, 경보 및 연동 기능을 갖도록 구현하여 운전의 편의성과 신뢰성이 증대되도록 하는 원자로 핵계측 계통의 디지털 제어시스템 및 방법에 관한 것으로서, 다수의 구동기에 의해 구동되는 다수의 검출기가 통로선택기에 의해 선택된 검출기 이동통로로 순차적으로 삽입되어 원자로로 이동되고, 원자로 내부의 중성자 분포를 검출하여 원자로의 현 상태를 � �식할 수 있도록 하는 제어시스템에 있어서, 운전자에 의해 수동으로 설정되는 운전정보 또는 미리 설정되어 있는 운전정보를 이용하여 운전제어신호를 출력하고, 운전제어신호에 응하여 전송되는 핵계측 데이터를 수집하여 관리하는 운전제어수단; 및 상기 운전제어수단의 운전제어신호에 응하여 상기 검출기가 상기 검출기 이동통로를 통해 소정 속도 및 방향으로 삽입 또는 인출되도록 하고, 상기 검출기를 통해 측정되는 원자로 내부의 중성자 분포 데이터를 수집하여 저장하는 한편, 상기 운전제어수단으로 전송하는 주제어수단을 포함하여 이루어진 것을 특징으로 한다.