公开(公告)号:AU2014277625B9
公开(公告)日:2018-04-26
申请号:AU2014277625
申请日:2014-06-06
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , DELABBIO FREDRIC CHRISTOPHER
Abstract: A variable length guide system for guiding a conveyance along a mineshaft, the variable length guide system extending downwardly from a work stage and being extendable or retractable to accommodate changes in distance between the work stage and a lower region of a mineshaft.
-
公开(公告)号:AU2014277625B2
公开(公告)日:2017-12-21
申请号:AU2014277625
申请日:2014-06-06
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , DELABBIO FREDRIC CHRISTOPHER
Abstract: A variable length guide system for guiding a conveyance along a mineshaft, the variable length guide system extending downwardly from a work stage and being extendable or retractable to accommodate changes in distance between the work stage and a lower region of a mineshaft.
-
公开(公告)号:EA025603B1
公开(公告)日:2017-01-30
申请号:EA201270084
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , ODDIE MAX EDWARD
Abstract: Визобретенииприразработкеподземногорудникаствол (80) шахтсоздают, вынимаягрунти удаляявынутуюпородуизствола (80) шахтыс помощьюсистемытранспортировкипороды, содержащейскипы (36), перемещающиесявверхи внизпоскиповымнаправляющимв стволешахты. Туннели (82) начинаютсооружатьотнижнейчастиствола (80) шахтывыемкойкаверны (81), вкоторойсобираюти эксплуатируютбуровуютуннелепроходческуюмашинудляпроходкитуннелей (82). Породупривыемкетуннелятранспортируютизтуннелейпоконвейеру (87) насистемутранспортировкипороды, установленнуюв стволешахтывовремяегосозданияи транспортирующуюпородув зонуповерхностиземли.
-
公开(公告)号:CL2016000391A1
公开(公告)日:2016-10-21
申请号:CL2016000391
申请日:2016-02-22
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , WEBB ROCKY LYNN
IPC: E21D7/02
Abstract: UN SISTEMA DE TRANSPORTE PARA MOVER UN MEDIO DE TRANSPORTE A LO LARGO DE UN POZO DE UNA MINA DURANTE LA CONSTRUCCIÓN DEL POZO, QUE COMPRENDE: UNA PRIMERA SECCIÓN DE GUIA; UNA SEGUNDA SECCIÓN DE GUIA LOCALIZADA A LO LARGO DEL POZO DE LA MINA EN SERIE CON LA PRIMERA SECCION DE GUIA, SIENDO MOVIL EL MEDIO DE TRANSPORTE A LO LARGO DE LA PRIMERA SECCION DE GUIA; Y UNA SECCIÓN DE CABEZA PARA RECIBIR EL MEDIO DE TRANSPORTE.
-
公开(公告)号:CL2015003539A1
公开(公告)日:2016-10-14
申请号:CL2015003539
申请日:2015-12-03
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , WEBB ROCKY LYNN
Abstract: SISTEMA DE GUIA DE LONGITUD VARIABLE PARA GUIADO DE UN TRANSPORTE A LO LARGO DE UN POZO DE MINA, DONDE DICHO SISTEMA SE EXTIENDE HACIA ABAJO DESDE UNA PLATAFORMA DE TRABAJO Y PUDIENDOSE EXTENDER O RETRAER PARA ADAPTARSE A LOS CAMBIOS EN LA DISTANCIA ENTRE LA PLATAFORMA DE TRABAJO Y UNA ZONA INFERIOR DE UN POZO DE MINA; SISTEMA DE TRANSPORTE.
-
公开(公告)号:AU2011217748B2
公开(公告)日:2015-05-07
申请号:AU2011217748
申请日:2011-02-22
Applicant: TECH RESOURCES PTY LTD
Inventor: ODDIE MAX EDWARD , JONES COLIN IAN , LABRECQUE PIERRE , DELABBIO FREDRIC CHRISTOPHER
IPC: E21C41/22
Abstract: A method of block cave mining comprising excavating undercut tunnels (21) at an undercut level; drilling undercut blast holes (25) through the undercut tunnel roofs and setting and detonating explosive charges in those holes to blast rock above the undercut tunnels to initiate the formation of broken rock caverns (26) above the undercut tunnels (21); excavating extraction level tunnels (22) at an extraction level below the undercut level; drilling drawbell blast holes (33) upwardly from the extraction level tunnels at selected drawbell locations toward the broken rock caverns (26) and setting and detonating explosive charges in those holes to blast drawbells (32) through which broken rock falls down into the extraction level tunnels (22); and progressively removing such fallen rock from the drawbell locations through the extraction level tunnels (22); wherein some of the excavation is done mechanically by tunnel boring machinery.
-
公开(公告)号:CA2920864A1
公开(公告)日:2015-02-26
申请号:CA2920864
申请日:2014-08-25
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , DELABBIO FREDRIC CHRISTOPHER
Abstract: A conveyance system for moving a conveyance along a mine shaft during shaft construction, comprising: a first guide section; a second guide section located along the mineshaft in series with the first guide section, the conveyance being movable along the first guide section; and a head section for receiving the conveyance, the head section cooperating with the first guide section to enable the conveyance to travel from the second guide section along the first guide section when received by the head section.
-
公开(公告)号:PE20130828A1
公开(公告)日:2013-08-17
申请号:PE2012001349
申请日:2011-02-22
Applicant: TECH RESOURCES PTY LTD
Inventor: ODDIE MAX EDWARD , JONES COLIN IAN , LABRECQUE PIERRE , DELABBIO FREDRIC CHRISTOPHER
IPC: E21C41/22
Abstract: METODO DE MINERIA POR HUNDIMIENTO DE BLOQUES QUE COMPRENDE EXCAVAR TUNELES 21 DE SOCAVADO A UN NIVEL DE SOCAVADO; PERFORAR ORIFICIOS 25 DE VOLADURA DE SOCAVADO A TRAVEZ DE LOS TECHOS DE TUNEL DE SOCAVADO Y COLOCAR Y DETONAR CARGAS EXPLOSIVAS EN ESOS ORIFICIOS PARA VOLAR ROCAS ENCIMA DE LOS TUNELES DE SOCAVADO PARA INICIAR LA FORMACION DE CAVERNAS 26 DE ROCAS ENCIMA DE LOS TUNELES 21 DE SOCAVADO; EXCAVAR TUNELES 22 A NIVEL DE EXTRACCION A UN NIVEL DE EXTRACCION INFERIOR AL NIVEL DE SOCAVADO; PERFORAR ORIFICIOS 33 DE VOLADURA DE PUNTO DE EXTRACCION HACIA ARRIBA DESDE LOS TUNELES A NIVEL DE EXTRACCION EN UBICACIONES DE PUNTO DE EXTRACCION SELECCIONADAS HACIA LAS CAVERNAS 26 DE ROCAS ROTAS Y COLOCAR Y DETONAR CARGAS EXPLOSIVAS EN ESOS ORIFICIOS PARA VOLAR PUNTOS 32 DE EXTRACCION A TRAVES DE LOS CUALES CAE ROCA ROTA DENTRO DE LOS TUNELES 22 A NIVEL DE EXTRACCION; EN EL QUE ALGO DE LA EXCAVACION SE REALIZA MECANICAMENTE MEDIANTE MAQUINARIA TUNELADORA
-
公开(公告)号:DE10793425T8
公开(公告)日:2013-04-25
申请号:DE10793425
申请日:2010-06-30
Applicant: TECH RESOURCES PTY LTD
Inventor: WEBB ROCKY LYNN , MEDD MORRIS JAMES , GOUGH RYAN GEORGE , DE LA VERGNE JOHN NICHOLAS , FEARN ANDY ROBERT , DELABBIO FREDRIC CHRISTOPHER
IPC: E21D1/03
-
公开(公告)号:MX2012009756A
公开(公告)日:2012-10-05
申请号:MX2012009756
申请日:2011-02-22
Applicant: TECH RESOURCES PTY LTD
Inventor: DELABBIO FREDRIC CHRISTOPHER , ODDIE MAX EDWARD , JONES COLIN IAN , LABRECQUE PIERRE
Abstract: La presente describe un método de minería por hundimiento de bloques que comprende excavar túneles 21 de socavado a un nivel de socavado; perforar orificios 25 de voladura de socavado a través de los techos de túnel de socavado y colocar y detonar cargas explosivas en esos orificios para volar rocas encima de los túneles de socavado para iniciar la formación de cavernas 26 de rocas rotas encima de los túneles 21 de socavado; excavar túneles 22 a nivel de extracción a un nivel de extracción inferior al nivel de socavado; perforar orificios 33 de voladura de punto de extracción hacia arriba desde los túneles a nivel de extracción en ubicaciones de punto de extracción seleccionadas hacia las cavernas 26 de rocas rotas y colocar y detonar cargas explosivas en esos orificios para volar puntos 32 de extracción a través de los cuales cae roca rota dentro de los túneles 22 a nivel de extracción; y retirar progresivamente tal roca caída de las ubicaciones de punto de extracción a través de los túneles 22 a nivel de extracción; en donde algo de la excavación se realiza mecánicamente mediante maquinaria tuneladora.
-
-
-
-
-
-
-
-
-