-
公开(公告)号:US20240026765A1
公开(公告)日:2024-01-25
申请号:US18476626
申请日:2023-09-28
Applicant: FMC Technologies, Inc.
Inventor: James Cook , Julian Keihany , Corey Massey , Andrew Krupa
IPC: E21B43/26
CPC classification number: E21B43/2607
Abstract: An illustrative modular manifold system includes, among other things, two or more modular pump manifolds, a low-pressure header, and a main high-pressure manifold. Modular pump manifolds may include a low-pressure manifold for supplying fracturing fluid or water to pumps, a high-pressure manifold for supplying fracturing fluid or water to one or more wells and a bleed-off/prime-up manifold. Each modular pump manifold of the modular manifold system is configured to be fluidly isolatable from the other modular pump manifolds. Each isolated modular pump manifold is configured to be flushed with water, bled off and primed up independently of the other modular pump manifolds. After the bleed off, maintenance procedures may be performed on pumps associated with the isolated modular pump manifold. The modular pump manifolds that are not isolated may continue in active fracing stage operations while a modular pump manifold is isolated.
-
公开(公告)号:US11339637B2
公开(公告)日:2022-05-24
申请号:US17104293
申请日:2020-11-25
Applicant: FMC Technologies, Inc.
Inventor: James Cook
Abstract: A modular pumping pad skid may include a base with one or more high pressure fluid conduits and one or more low pressure conduits. Additionally, two or more pumps may be removably fixed to the base, and fluidly connected to the high pressure fluid conduits and the low pressure conduits.
-
公开(公告)号:US20210131247A1
公开(公告)日:2021-05-06
申请号:US17046568
申请日:2019-04-11
Applicant: FMC Technologies, Inc.
Inventor: Tep Ungchusri , Philippe Espinasse , Jean-Luc Streiff , Gary Bernard , Brian Swagerty , Johann Rongau , Sunil Dutt , Dan Fink , Justin Taylor , James Cook
Abstract: A method for performing simultaneous operations at a wellsite comprising two or more adjacent wellheads, each respectively connected to a well, may include the following steps: providing a fluid supply via upstream equipment to an intermediate supply point; fluidly connecting the intermediate supply point to a single wellhead, the fluidly connecting comprising connecting a first end of a flexible pipe to the intermediate supply point and a second end of the flexible pipe to a first wellhead; performing a wellbore operation on a first well using the fluid supply from the upstream equipment supplied to the first wellhead; disconnecting the second end of the flexible pipe from the first wellhead; and connecting the second end of the flexible pipe to a second wellhead.
-
-