Abstract:
In a computer-implemented method of altering an interface, an interface associated with an application having time-dependent events is displayed. The interface displays at least one activatable component. At a pre-set time relative to a time for one of said time-dependent events, the interface is altered to add an added activatable component, or to set a pre-determined one of the activatable components of the interface as a selected component.
Abstract:
A scanning probe microscope's probe tip dimensions as they exist or existed for a certain data or measurement are inferred based on probe activity taking place since a probe characterization procedure was performed. The inferred probe tip dimensions can be used to correct nanoscale measurements taken by the probe to account for changes in the probe's geometry such as wear.
Abstract:
The preferred embodiments are directed to a method and apparatus of operating a scanning probe microscope (SPM) to perform sample measurements using a survey scan that is less than five lines, and more preferably two lines, to accurately locate a field of features of a sample. This is accomplished by selecting a step distance between adjacent lines of the survey scan that does not equal the pitch of the features in a direction orthogonal to the direction the survey scan traverses, i.e., does not equal the pitch of the features in the scan direction, XPO. The aspect ratio of the scans can also be modified to further improve sample throughput.
Abstract:
Methods and systems are provided for coordinating a project-commitment process for an organization. An interface is provided to a computational system for coordinating communications among personnel of the organization. A request is received from a customer or an agent of the customer at the organization. The request includes specification of project parameters for a project. A series of communications within the organization are coordinated using the computational system to evaluate a capacity of the organization to implement the project in accordance with the project parameters. From the evaluated capacity, it is determined whether the organization may commit to performing the project on behalf of the customer.