-
公开(公告)号:US11875477B2
公开(公告)日:2024-01-16
申请号:US17354188
申请日:2021-06-22
Applicant: NATIONAL APPLIED RESEARCH LABORATORIES
Inventor: Chih-Wei Wang , Chuan-Lin Lai , Chia-Chen Kuo , I-Chen Wu
IPC: G06T5/00 , G06T7/00 , G06F18/2135
CPC classification number: G06T5/001 , G06F18/2135 , G06T7/0002 , G06T2207/10024 , G06T2207/10028 , G06T2207/20021 , G06T2207/30168
Abstract: A method for correcting abnormal point cloud is disclosed. Firstly, receiving a Primitive Point Cloud Data set by an operation unit for dividing a point cloud array into a plurality of sub-point cloud sets and obtaining a plurality of corresponding distribution feature data according to an original vector data of the Primitive Point Cloud Data set. Furthermore, recognizing the sub-point cloud sets according to the corresponding distribution feature data for correcting recognized abnormal point cloud. Thus, when the point cloud array is rendered to a corresponding image, the color defect of the point cloud array will be improved or decreased for obtaining lossless of the corresponding image.
-
2.
公开(公告)号:US09612875B2
公开(公告)日:2017-04-04
申请号:US14541377
申请日:2014-11-14
Applicant: NATIONAL APPLIED RESEARCH LABORATORIES
Inventor: Ming-Jen Wang , Chih-Wen Chang , Chuan-Lin Lai , Chia-Chen Kuo , Jiang-Siang Lian
CPC classification number: G06F9/5061 , G06F9/4856 , G06F9/5005 , G06F9/5027
Abstract: The present invention provides an operational-task-oriented system and method for dynamically adjusting operational environment applicable to a computer cluster. Each operational node of the computer cluster has two or more operational systems installed. After receiving the operational task, the control node estimates the time required for completing different tasks requiring different operational systems by appropriate operational nodes and compares the estimated finish time and the assigned finish time for judging how to adjust the operating system running in the operational nodes. Thereby, the operational task can be completed in the assigned finish time. Another method is to use the control node to analyze the proportions of the tasks requiring different operational systems in an operational task and hence adjusts the operational system running in an operational node according to the proportion of requirement. Thereby, the operational task can be completed in the shortest time.
-
公开(公告)号:US10943090B2
公开(公告)日:2021-03-09
申请号:US16108614
申请日:2018-08-22
Applicant: NATIONAL APPLIED RESEARCH LABORATORIES
Inventor: Chia-Chen Kuo , Chih-Yang Lin , Shang-Ming Wang , Wen-Jung Huang
Abstract: The present invention provides a method for tracking face in a video, comprising steps of taking an image sample from a video; extracting and storing a target face feature according to the image sample; dividing the video into one or more scene; and labeling one or more face matching the target face feature. Accordingly, an actor's facial expression and motion can be extracted with ease and used as training materials or subject matters for discussion.
-
-